ML17334A032

From kanterella
Jump to navigation Jump to search
the ISFSI - Submittal of Revised Emergency Plan Implementing Procedures (Epips)
ML17334A032
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/27/2017
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML17334A032 (2)


Text

SOUTHERN CALIFORNIA EDISON~ Al Bates Manager, Regulatory Affairs An EDISON INTERNATIONAL@ Company November 27, 2017 10 CFR 50.54(q)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revised Emergency Plan Implementing Procedures (EPIPs)

San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Pursuant to 10 CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following revised Emergency Plan documents:

Procedure Rev. Effective Date S0123-VIII-ADMIN-2, Emergency 3 October 26, 2017 Preparedness Program Training S0123-VIII-ER0-1, PDEP Standards and 2 October 26, 2017 Expectations As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for these EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.

There are no commitments contained in this letter or its attachments.

fatLi-5 .

A)!vf 5 5 1-(p tif_/(

P. 0. Box 128 fJ/055 San Clemente, CA 92672

Document Control Desk If you have any questions, please contact me at (949) 368-6945.

Sincerely, G,~

Attachments: 1. Revised Emergency Plan Implementing Procedures

2. Report and Analysis Summaries cc: Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)

K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI P. 0. Box 128 San Clemente, CA 92672