CATEGORY 1 REGULATOR INFORMATION DISTRIBUTION+TEM (RIDE)

&7 ACCESSION NBR:9709160324 DOC.DATE: 97/08/31 NOTARIZED: NO DOCKET I FACIL:50-316.Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.SAME...

AUTHOR AFFILIATION MINOR,J.W.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele SAMPSON,J.R.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENTM AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1997 for Donald C Cook Nuclear Power Plant, Unit 2.W/970908 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

A I

T RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J ILE CENT 01 0 'A FA NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

0 U

E N

NOTE TO ALL "RIDS" RECIPiENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

I l

1 indiana Ittchigan Power Company Cook Nuclear Plant One Cook Place Bridgman, MI49106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 (1

t September 8, 1997

/@8M'kl semaeanr PSALM Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2.

Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of August 1997 is submitted.

S

rely, J.R. Sa n

Plant Manager fjc Attachment c:

NRC Region III D.R. Hahn R.C. Callen S.

Hamming B.

Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner

~qt=w<'.L.

Bartlett c ~rlwp Jg 9709i60324 97083i PDR ADQCK 050003ib R

PDR

.R.C. OPERATING DATAREPORT

~

~

~

DOCKET NO.

50- 316 DATE September 5, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 D. C. Cook Unit2 Aug-97 3411 1133 1090 We) 1100 1060 OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net IVlWe)
6. Maximum Dependable Capacity (GROSS M
7. Maximum Dependable Capacity (Net MWe)

Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level To Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 2526625.9 788980.0 761955.0 100.0 100.0 96.6 94.0 0.0 Year-to-Date 5832.0 5567.1 0.0 5513.8 0.0 18179465.1 5876480.0 5678400.0 94.5 94.5 91.9 89.3 5.5 Cumulative 172392.0 121579.0 0.0 117961.4 0.0 365357732.1 118380870.0 114060966.0 69.4 69.4 63.2 61.6 13.8
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

Refueling outage to begin September 27, 1997 for an estimated duration of 40 days

25. IfShut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 September 5, 1997 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

AUGUST 1997 DAY 8/1/97 8/2/97 8/3/97 8/4/97 8/5/97 8/6/97 8/7/97 8/8/97 8/9/97 8/10/97 8/11/97 8/12/97 8/13/97 8/14/97 8/15/97 8/16/97 AVERAGE DAILY POWER LEVEL 1029 1019 1014 1017 1049 1037 1021 1021 1022 1020 935 1020 1036 1039 1030 1025 DAY 8/17/97 8/18/97 8/19/97 8/20/97 8/21/97 8/22/97 8/23/97 8/24/97 8/25/97 8/26/97 8/27/97 8/28/97 8/29/97 8/30/97 8/31/97 AVERAGE DAILY POWER LEVEL 1024 1025 1035 1013 1033 1037 1030 1032 1027 1025 1025 1027 1030 1026 1025

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 September 5, 1997 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-AUGUST 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month ofAugust was 788980 MWh.

DETAILS-08/11/97 08/12/97 1010 Commenced Reactor power reduction to replace Cell 34 of the CD Battery.

1609 Reactor power stablized at 80% RTP.

1908 Commenced Reactor power ascension following repairs.

0200 Power stablized at 100% RTP.

Alltime entries are Eastern Standard Time (EST).

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2.

September 5, 1997 JF Center, 616-697-5098 1 of1 P

UNITSHUTDOWNS AND POWER REDUCTIONS - AUGUST 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power recuctions this month.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source