CATEGORY 1 REGULATO INFORMATION DISTRIBUTION TEM (RIDE) r ACCESSION~ NBR:9707220354 DOC.DATE: 97/06/30 NOTARIZED:
NO DOCKET FACIL:50-316 Donald C.
Cook Nuclear, Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele CENTER,J.F.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele SAMPSON,J.R.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for June 1997 for DC Cook Nuclear Plant Unit 2.W/970707 ltr.
l DISTRIBUTION 'CODE:
IE24D COPIES'ECEIVED:LTR l
ENCL 1
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 I
RECIPIENT COPIES ID CODE/NAME LTTR ENCL HICKMAN,J 1
1 FILE CENTER OW, 1
1 OC/DBA/PAD 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 NOTE TO ALL "RIDSN RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESKJ ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUT10N LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
indiana Michigan Power Company Cook wudear Piani ~
One Cook Place Bridgman, MI49106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 July 7, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1997 is submitted.
Sincerely, J.R. Sampson Plant Manager fjc Attachment
~anA14
'V v w 4 NRC Region III D.R. Hahn R.C. Callen S.
Hamming B.
Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E. Russo 9707220354 970b30
/
POR AOQCK 050003ib R
POR illlllllllllllllllIlll/lllllllllllllllll
t i
N.R.C. OPERATING DATAREPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50 - 316 June 4, 1997 JW Minor 616465-5901 D. C. Cook Unit 2 Jun-97 3411 1133 1090 OSS MWe) 1100 MWe) 1060 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GR
- 7. Maximum Dependable Capacity (Net Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. LlnitForced Outage Rate This Month 720.0 720.0 0.0 720.0 0.0 2449927.6 781990.0 755969.0 100.0 100.0 99.1 96.3 0.0 Year-to-Date 4344.0 4079.1 0.0 4025.8 0.0 13122447.4 4291330.0 4147178.0 92.7 92.7 90.1 87.6 7.3 Cumulative 170904.0 120091.0 0.0 116473.4 0.0 360300714 4 116795720.0 112529744.0 69.1 69.1 62.9 61.3 14.0
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
Refueling outage to begin September 26, 1997 for an estimated duration of 48 days
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
h DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 DC Cook Unit2 June 4, 1997 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
JUNE 1997 DAY 6/1/97 6/2/97 6/3/97 6/4/97 6/5/97 6/6/97 6/7/97 6/8/97 6/9/97 6/10/97 6/11/97 6/12/97 6/13/97 6/14/97 6/15/97 6/16/97 AVERAGE DAILY POWER LEVEL 1076 1075 1077 1070 1069 1067 1064 1067 1066 1064 1060 1058 1053 1050 1054 1048 DAY 6/17/97 6/18/97, 6/19/97 6/20/97 6/21/97 6/22/97 6/23/97
'/24/97 6/25/97 6/26/97 6/27/97 6/28/97 6/29/97 6/30/97 AVERAGE DAILY POWER LEVEL 1051 1059 1049 1041 1034 1030 1025 1025 1027 1024 1028 1029 1026 1034
~
~
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D C Cook Unit 2 July 7, 1997 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-JUNE 1997 The unit entered this reporting period in Mode 1 at 100% RTP.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of June was 781990.0 MWh.
DKX6lLS-Alltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 July 7, 1997 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - JUNE 1997 DURATION NO.
DATE TYPE'OURS REASON METHOD OF SHUTTING LICENSEE DOWN EVENT REACTOR REPORT NO.
SYSTEM CODE COMPONENT CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100% RTP this month.
~K:
F: Forced S: Scheduled
~6598:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 2JKXHQD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)
~iIEh1:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
DIIELEMD Exhibit I: Same Source
0
)
'A a~
t f*
fd
'I I
J ~
P tf