ATTACHMENT 2 TO AEP:NRC: 1223B WESTINGHOUSE CORPORATION APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Westinghouse Electric Corporation Energy Systems Nuclear Services Oivision Box 355 Pittsburgh Pennsylvania 15230 0355 April 28, 1997 NSD-NRC-97-5092 Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
Subject:
"Core Uncovery Due to Loop Seal Re-Plugging During Post-LOCA Recovery,"
March 1997 Attached is one copy of letter report "Core Uncovery Due to Loop Seal Re-Plugging During Post-LOCA Recovery," March 1997.
This report contains information which is proprietary to Westinghouse Electric Corporation.
Accordingly, we request that this information be withheld from public disclosure.
We willcomply with the requirements of 10 CFR 2.790 to provide proprietary and non-proprietary version of the above material together with an affidavit as soon as the proprietary and non-proprietary versions have been prepared.
We willsubmit the total required number of copies of the proprietary and non-proprietary versions of the information and the required affidavit at that time.
We expect to be able to fullycomply with the requirements of the proprietary and non-proprietary versions of the information and an accompanying affidavit within eight weeks.
Very truly yours, Nicholas J. Li arulo, Manager Equipment Design and Regulatory Engineering DP/bbp Attachment cc:
Kevin Bohrer/NRC(12H5)
NRC$092:April 28, t997:ESQ52 "The mission ofHSD is to prouide our customers with people, equipment and services that set the standards ofexcellence in the nuclear industry."
9705070284 970430 PDR ADQCK 050003i5 P
/
(t, 4
ATTACHMENT 1 TO AEP:NRC:1223B CORE UNCOVERY DUE TO LOOP SEAL RE-PLUGGING DURING POST-LOCA RECOVERY