Forwards Request for Addl Info Re TS Change to Reflect Power Uprate
ML17333A875
Person / Time
Site: Cook  
Issue date: 05/01/1997
From: John Hickman
NRC (Affiliation Not Assigned)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO.
References
TAC-M96363, TAC-M96364, NUDOCS 9705050303
Download: ML17333A875 (8)


Text

May 1',

1997 Hr.

E.

E. Fitzpatrick, Vice President Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive

Buchanan, HI 49107

SUBJECT:

DONALD C.

COOK NUCLEAR PLANT, UNIT NOS.

1 AND 2 REQUEST FOR ADDITIONAL INFORMATION RE:

POWER UPRATE PROGRAM (TAC NOS.

H96363 AND H96364)

Dear Mr. Fitzpatrick:

The staff is reviewing your submittal dated July ll, 1996.

We will require additional information to complete our review.

Please respond to the enclosed Request for Additional Information within 60 days.

Please contact me at (301) 415-3017 if you have any questions on the above.

Sincerely, Origi.nal signed by:

John B. Hickman, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.

50-315/316

Enclosure:

Request for Additional Information cc w/encl:

See next page DISTRIBUTION:

Docket File PUBLIC EAdensam (EGAl)

PD3-3 Reading JRoe GMarcus OGC ACRS GGrant, RIII O,)O.I j.9 DOCUMENT NAME:

G:

DCCOOK C096364.RAI III'ILEtIlEHER Cmpw OFFICE NAME DATE PH:PD33 JHickman

/9 E

LA:PD33 E

CBo le

// /9

""~ICIAL RECORD COPY

!(

9705050303 97050i PDR ADQCK 050003i5 PDR

C

May i, 1997 Hr.

E.

E. Fitzpatrick, Vice President Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive

Buchanan, HI 49107

SUBJECT:

DONALD C.

COOK NUCLEAR PLANT, UNIT NOS.

1 AND 2 REQUEST FOR ADDITIONAL INFORMATION RE:

POWER UPRATE PROGRAM (TAC NOS.

H96363 AND H96364)

Dear Hr. Fitzpatrick:

The staff is reviewing your submittal dated July ll, 1996.

We will require additional information to complete our review.

Please respond to the enclosed Request for Additional Information within 60 days.

Please contact me at (301) 415-3017 if you have any questions on the above.

Sincerely, Original signed by:

John B. Hickman, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.

50-315/316

Enclosure:

Request for Additional Information cc w/encl:

See next page DISTRIBUTION:

Docket File PUBLIC EAdensam (EGAl)

PD3-3 Reading JRoe

~ GMarcus OGC ACRS GGrant, RIII DOCUMENT NAME:

G:iDCCOOK C096364.RAI OFFICE PH:PD33 E

LA'PD33 NAME DATE JHickma

/9 CBo le

/ I /9 OFFICIAL RECORD COPY

f k ~

1.AR RECy

)

~ P.

4 IO A.0O I

0 0

~O

++*++

t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 1, 1997 Mr. E.

E. Fitzpatrick, Vice President Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan,'HI 49107

SUBJECT:

DONALD C., COOK NUCLEAR PLANT, UNIT NOS.

1 AND 2 RE(UEST FOR ADDITIONAL INFORMATION RE:

POWER UPRATE PROGRAM (TAC NOS.

H96363 AND H96364)

Dear Hr. Fitzpatrick:

The staff is reviewing your submittal dated July ll, 1996.

We will require additional information to complete our review.

Please respond to the enclosed Request for Additional Information within 60 days.

Please contact me at (301) 415-3017 if you have any questions on the above.

Sincerely, Docket Nos. 50-315/316 John B. Hickman, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Enclosure:

Request for Additional Information cc w/encl:

See next page

Hr.

E.

E. Fitzpatrick Indiana Michigan Power Company CC:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Attorney General Department of Attorney General 525 West Ottawa =Street

Lansing, Michigan 48913 Township Supervisor Lake Township Hall P.O.

Box 818 Bridgman, Michigan 49106 Al Blind, Site Vice President Donald C.

Cook Nuclear Plant 1 Cook Place Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspector's Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.

W.

Washington, DC 20037 Mayor, City of Bridgman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Room 1

State Capitol

Lansing, Michigan 48909 Drinking Water and Radiological Protection Division Michigan Department of Environmental guality 3423 N. Hartin Luther King Jr Blvd P. 0.

Box 30630 CPH Mailroom

Lansing, Michigan 48909-8130 Donald C.

Cook Nuclear Plant Hr. Steve J.

Brewer Indiana Michigan Power Nuclear Generation Group 500 Circle Drive

Buchanan, Michigan 49107 August 1996

REQUEST FOR ADDITIONAL INFORMATION FOR TECHNICAL SPECIFICATION CHANGE TO REFLECT POWER UPRATE DONALD C.

COOK NUCLEAR POWER PLANT, UNIT NOS.

1 AND 2 DOCKET NOS.

50-315 AND 50-316 (TAC NOS.

M96363 AND M96364) l.

It is stated in Attachment 7 of the July ll, 1996, submittal that Westinghouse's uprating evaluation has shown that the component cooling water system (CCW) flows provided by AEP are acceptable with Unit 2 operating at the uprated conditions.

Therefore, no changes to the CCW system are required due to uprating.

We have reviewed Westinghouse Topical Report, WCAP-14489, "Donald C.

Cook Nuclear Plant Unit 2 3600 MWt Uprating Program Licensing Report," but have not been able to locate Westinghouse's evaluation of the impact of plant operations at. the proposed power level on CCW.

Please provide information to clarify, or provide evaluation to demonstrate, that Unit 2 operations at the proposed uprated power level will have an insignificant or no impact on the CCW system.

2.

It is stated in Attachment 7 of the July ll, 1996, submittal that the design of the waste disposal

system, as described in the UFSAR, is not affected by the uprating of Unit 2.

However, it is not clear that the existing design of the radwaste (liquid, solid, and gaseous) systems is based on a core power level which bounds the proposed core power level of 3588 MWt.

Please provide information to clarify, or provide evaluation to demonstrate, that plant operations at the proposed uprated power level will have an insignificant or no impact on the radwaste systems.

ENCLOSURE

~.

0 I