,CATEGORY REGULRIe.'NFORMATION DISTRIBUTZO STEM (RIDE)
ACCESSION NBR:9703120122 DOC.DATE: 97/02/28 NOTARIZED: NO DOCKET ¹ FACIL:50-315 Donald C.
Cook Nuclear Power Plant.-, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION RUSSO,M.E.
MINORFJ.W.
SAMPSON,J.R.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Feb 1997 for Donald C.Cook Nuclear Plant, Unit 1.W/970303 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-.3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 COPIES RECIPIENT LTTR ENCL
'D CODE/NAME 1
1 HICKMANFJ 1
1 CENTER 1
1
~B 1
1 COPIES LTTR ENCL 1
1 1
1 1
1 0
EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 D
U M
i E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
indiana Michigan~
Power Company ~
500 Circle Drive Buchanan, Ml 491071395 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 ENQMM/l StlmlGAlN PQWlER March 3, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1
Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1997 is submitted.
Sincerely, J.R. Sampson Plant Manager
/mr Attachment NRC Region III D.R. Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L'. Bartlett M.E.
Russo'20068 9703120122 970228 PDR ADOCK 05000315 R
'iiiilllllliMillllil[lll)Iliiiill[llllllll
.~
t p 'l
t t
N.R.C. OPERATING DATAREPORT DOCKET NO.
50 - 315 DATE Mar. 3, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 D. C OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS MWe)
- 7. Maximum Dependable Capacity (Net MWe)
Cook Unit1 Feb-97 3250 1152 1020 1056 1000 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 672.0 672.0 0.0 672.0 0.0 1928316.0 637820.0 613492.0 100.0 100.0 91.3 89.5 0.0 Year-to-Date 1416.0 1416.0 0.0 1416.0 0.0 4268815.2 1414080.0 1362477.0 100.0 100.0 96.2 94.3 0.0 Cumulative 194280.0 148003.3 463.0 145624.8 321.0 430073612.2 139713990.0 134413838.0 75.8 75.8 69.0 67.3 5.9
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
Refuelin outa e to be in March 1, 1997 for an estimated duration of 48 da s
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
0 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 315 D.C. Cook Unit1 Mar. 3, 1997 JW Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
FEBRUARY 1997 DAY 2/1/97 2/2/97 2/3/97 2/4/97 2/5/97 2/6/97 2/7/97 2/8/97 2/9/97 2/10/97 2/11/97 2/12/97 2/13/97 2/14/97 2/15/97 2/16/97 AVERAGE DAILY POWER LEVEL 1007 1007 1005 1005 1007 1007 1006 1006 1005 1006 1008 1005 1006 1005 992 977 DAY 2/17/97 2/18/97 2/19/97 2/20/97 2/21/97 2/22/97 2/23/97 2/24/97 2/25/97 2/26/97 2/27/97 2/28/97 AVERAGE DAILY POWER LEVEL 955 935 915 895 877 854 831 812 718 651 601 465
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit1 Mar. 3, 1997 ME Russo 616-697-5100 1 of1 MONTHLYOPERATING ACTIVITIES-FEBRUARY 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 97% RTP.
Commenced Reactor power coastdown February 15, 1997 at 0000 in preparation for the upcoming refueling outage.
Reactor power was stabilized at 51% RTP February 27, 1997 at 2235 for planned Steam Generator safety valve testing.
The unit exited this reporting period in Mode 1 at 30% RTP and reducing power in preparation for the March 1, cycle 15 to 16 maintenance and refueling outage.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of February was 637820 MWH.
DETAILS 02-15-97 0000 'ommenced Reactor power coastdown in preparation for the cycle 15 to 16 refueling outage.
02-27-97 1112 Commenced Reactor power decrease for planned Steam Generator safety valve testing.
02-28-97 2235 2244 0609 Reactor power stabilized at 51% RTP.
Commenced Steam Generator safety valve testing.
Steam Generator safety valve testing complete.
2040 Commenced Reactor power decrease in preparation for the cycle 15 to 16 refueling outage.
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unitl Mar. 3, 1997 ME Russo 616-697-5100 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS - FEBRUARY 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT 'YSTEM COMPONENT NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 329 021597 S
N/A B,C N/A N/A N/A N/A Reactor power coastdown/reduction commenced 021597 at 0000 in preparation for the 030197 commencement of the cycle 15-16 refueling and maintenance outage.
1 F: Forced S: Scheduled 2
Reason:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 Method:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit I: Same Source