CATEGORY REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
AC+~PSi'.6N NBR:9703120109 DOC.DATE: 97/02/28 NOTARIZED: NO DOCKET FACIAL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION RUSSOIM.E.
MINORPJ.W.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1997 for Donald C Cook Nuclear Plant, Unit 2.W/97)303 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME HICKMAN,J COPIES LTTR ENCL 1
1 INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 1
1 1
1 1
1 OC/DBA/PAD 01 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
~ W c
sg
-)
q1
Indiana Michigan~
Power Company 500 Circle Drive Buchanan, MI 491071395 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 MOlki84 NlcNIGAN PQMfM March 3, 1997 Gentlemen, Pursuant to the requirements of Donald -C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1997 is submitted.
Sincerely, J.R. Sampson Plant Manager
/mr Attachment c:
NRC Region III D.R. Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett
'.J.
Brewer D.W. Paul
~ J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E. Russo 9703i20i09 970228 PDR AMCK 050003ih R
PDR 12007 j.
I!Illllllllilllllil!
Illlllllllilllllillllll
t N.R.C. OPERATING DATAREPORT DOCKET NO.
50 - 316 DATE Mar. 3, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 D. C OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS MWe)
- 7. Maximum Dependable Capacity (Net MWe)
Cook Unit 2 Feb-97 3411 1133 1090 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 672.0 672.0 0.0 672.0 0.0 1951801.5 637760.0 614632.0 100.0 100.0 86.3 83.9 0.0 Year-to-Date 1416.0 1416.0 0.0 1416.0 0.0 4365790.7 1432280.0 1382732.0 100.0 100.0 92.1 89.6 0.0 Cumulative 167976.0 117427.9 0.0 113863.6 0.0 351544057.7 113936670.0 109765298.0 68.8 68.8 62.5 60.8 14.0
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 Mar. 3, 1997 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
FEBRUARY 1997 DAY 2/1/97 2/2/97 2/3/97 2/4/97 2/5/97 2/6/97 2/7/97 2/8/97 2/9/97 2/10/97 2/11/97 2/12/97 2/13/97 2/14/97 2/15/97 2/16/97 AVERAGE DAILY POWER LEVEL 1090 1096 1092 1090 1090 1092 1062 564 550 549 550 552 550 551 548 545 DAY 2/17/97 2/1 8/97 2/19/97 2/20/97 2/21/97 2/22/97 2/23/97 2/24/97 2/25/97 2/26/97 2/27/97 2/28/97 AVERAGE DAILY POWER LEVEL 998 1098 1098 1093 1095 1093 1092 1091 1097 1093 1096 1096
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 Mar. 3, 1997 ME Russo 616-697-5100 1 of1 MONTHLYOPERATING ACTIVITIES-FEBRUARY 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.
Reactor power was reduced to 55% RTP on February 8 to facilitate planned East Main Feedpump maintenance and testing. The unit was restored to 100% RTP on February 17 at 1000.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of February was 637760 MWH.
DETAILS 02-07-97 02-08-97 02-16-97 02-17-97 1944 0307 0344 0445 2347 0704 0714 1000 Commenced Reactor power reduction to facilitate planned maintenance on the East Main Feedpump.
Reactor power at 57% RTP.
East Main Feedpump manually tripped.
Reactor power stabilized at 55% RTP.
Commenced Reactor power ascension.
Reactor power stabilized at 89.5% RTP to perform a thermal power evaluation.
Evaluation complete.
Commenced power ascension.
Reactor power stabilized at 100% RTP.
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit.2 Mar. 3, 1997 ME Russo 616-697-5100 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - FEBRUARY 1997 METHOD OF SHUTIING LICENSEE DURATION'OWN EVENT SYSTEM
'COMPONENT NO DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 255 020897 S
N/A N/A N/A N/A N/A Reactor power was reduced to 55% RTP 020897 at 0445 to facilitate planned maintenance and testing on the East Main Feedpump.
The unit was restored to 100% RTP 021797 at 1000.
1 F: Forced S: Scheduled 2
Reason:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 Method:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit I: Same Source