Monthly Operating Rept for Feb 1997 for Donald C Cook Nuclear Plant,Unit 2
ML17333A807
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/28/1997
From: Minor J, Russo M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703120109
Download: ML17333A807 (8)


Text

CATEGORY REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

AC+~PSi'.6N NBR:9703120109 DOC.DATE: 97/02/28 NOTARIZED: NO DOCKET FACIAL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION RUSSOIM.E.

Indiana Michigan Power Co.

MINORPJ.W.

Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1997 for Donald C Cook Nuclear Plant, Unit 2.W/97)303 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME HICKMAN,J COPIES LTTR ENCL 1

1 INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 1

1 1

1 1

1 OC/DBA/PAD 01 1

1 1

1 EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

1 1

1 NOAC 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

~ W c

sg

-)

q1

Indiana Michigan~

Power Company 500 Circle Drive Buchanan, MI 491071395 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 MOlki84 NlcNIGAN PQMfM March 3, 1997 Gentlemen, Pursuant to the requirements of Donald -C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1997 is submitted.

Sincerely, J.R. Sampson Plant Manager

/mr Attachment c:

NRC Region III D.R. Hahn R.C. Callen S.

Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett

'.J.

Brewer D.W. Paul

~ J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E. Russo 9703i20i09 970228 PDR AMCK 050003ih R

PDR 12007 j.

I!Illllllllilllllil!

Illlllllllilllllillllll

t N.R.C. OPERATING DATAREPORT DOCKET NO.

50 - 316 DATE Mar. 3, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 D. C OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS MWe)
7. Maximum Dependable Capacity (Net MWe)

Cook Unit 2 Feb-97 3411 1133 1090 1100 1060 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level To Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 672.0 672.0 0.0 672.0 0.0 1951801.5 637760.0 614632.0 100.0 100.0 86.3 83.9 0.0 Year-to-Date 1416.0 1416.0 0.0 1416.0 0.0 4365790.7 1432280.0 1382732.0 100.0 100.0 92.1 89.6 0.0 Cumulative 167976.0 117427.9 0.0 113863.6 0.0 351544057.7 113936670.0 109765298.0 68.8 68.8 62.5 60.8 14.0
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 Mar. 3, 1997 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

FEBRUARY 1997 DAY 2/1/97 2/2/97 2/3/97 2/4/97 2/5/97 2/6/97 2/7/97 2/8/97 2/9/97 2/10/97 2/11/97 2/12/97 2/13/97 2/14/97 2/15/97 2/16/97 AVERAGE DAILY POWER LEVEL 1090 1096 1092 1090 1090 1092 1062 564 550 549 550 552 550 551 548 545 DAY 2/17/97 2/1 8/97 2/19/97 2/20/97 2/21/97 2/22/97 2/23/97 2/24/97 2/25/97 2/26/97 2/27/97 2/28/97 AVERAGE DAILY POWER LEVEL 998 1098 1098 1093 1095 1093 1092 1091 1097 1093 1096 1096

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 Mar. 3, 1997 ME Russo 616-697-5100 1 of1 MONTHLYOPERATING ACTIVITIES-FEBRUARY 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.

Reactor power was reduced to 55% RTP on February 8 to facilitate planned East Main Feedpump maintenance and testing. The unit was restored to 100% RTP on February 17 at 1000.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of February was 637760 MWH.

DETAILS 02-07-97 02-08-97 02-16-97 02-17-97 1944 0307 0344 0445 2347 0704 0714 1000 Commenced Reactor power reduction to facilitate planned maintenance on the East Main Feedpump.

Reactor power at 57% RTP.

East Main Feedpump manually tripped.

Reactor power stabilized at 55% RTP.

Commenced Reactor power ascension.

Reactor power stabilized at 89.5% RTP to perform a thermal power evaluation.

Evaluation complete.

Commenced power ascension.

Reactor power stabilized at 100% RTP.

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit.2 Mar. 3, 1997 ME Russo 616-697-5100 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - FEBRUARY 1997 METHOD OF SHUTIING LICENSEE DURATION'OWN EVENT SYSTEM

'COMPONENT NO DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 255 020897 S

N/A N/A N/A N/A N/A Reactor power was reduced to 55% RTP 020897 at 0445 to facilitate planned maintenance and testing on the East Main Feedpump.

The unit was restored to 100% RTP 021797 at 1000.

1 F: Forced S: Scheduled 2

Reason:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 Method: