February 20, 1997 Mr. E.
E. Fitzpatrick, Vice President Indiana Hichigan Power Nuclear Generation Group 500 Circle Drive
- Buchanan, HI 49107
SUBJECT:
DONALD C.
COOK NUCLEAR PLANT, UNIT NOS.
1 AND 2, CLARIFICATION OF RELIEF REGARDING VT-2 EXAMINATIONS AND CORRECTIVE ACTIONS (TAC NOS.
H97179 AND H97180)
Dear Hr. Fitzpatrick:
By letters dated October 25,
- 1996, and November 27,
Cook Nuclear Plant Units 1
and 2, requested relief for class 1,
2 and 3 systems from the requirements of the 1989 Edition 'of the ASME Boiler and Pressure Vessel
- Code,Section XI, in regard to VT-2 visual examination of insulated components stated in paragraph IWA-5242(a).
By letter dated January 16, 1997, the staff authorized you to use Code Case N-533 in lieu of the requirements of Subsection IWA-5242(a) of the 1989 Edition of the ASME Code,Section XI until such time as the code case is included in a future revision of Regulatory Guide
- 1. 147.
Subsequently, y'our staff questioned the applicability of Code Case N-533, which is specifically written for class 1 systems, to class 2 and 3 systems.
It is the staff's position that the relief we granted you to use Code Case N-533 also applies to the less safety significant class 2 and 3 systems.
Therefore, the alternative requirements of Code Case N-533 may also be applied to the examinations performed on class 2 and 3 systems.
Please contact me at (301) 415-3017 if you have any questions regarding the above.
Sincerely, Original signed by:
John B. Hickman, Project Hanager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-315 and 50-316 cc w/encl:
See next page I
VJIIRIEU ION'ocket File PUBLIC JRoe GMarcus
'GAl OGC JCaldwell, RIII GHill PDt 3-3 Reading ACRS DOCUMENT NAME:
G:ItDCCOOKitC097179.LTR To tecetye ~ oopy of thte ttocument, Indoete In ttw btot: 'C' Copy without ettechment/endoetee E
e Copy with ettechmentfendoeure
'N' No copy OFFICE PH:PD33 E
LA:PD33
'E JHickman NAME DATE Q./I $'97 EBarnhill g/
/97 OFF CIAL RECORD COPY 9702250133 970220 PDR ADQCK 050003i5 P
Hr. E.
E. Fitzpatri ck Indiana Michigan Power Company CC:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Hichigan 48913 Township Supervisor Lake Township Hall P.O.
Box 818 Bridgman, Hichigan 49106 Al Blind, Site'ice President Donald C.
Cook Nuclear Plant 1 Cook Place Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspector's Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire
- Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.
W.
Washington, DC 20037 Mayor, City of Bridgman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol
- Lansing, Michigan 48909 Drinking Water and Radiological Protection Division Michigan Department of Environmental equality 3423 N. Hartin Luther King Jr Blvd P. 0.
Box 30630 CPH Mailroom
- Lansing, Michigan 48909-8130 Donald C.
Cook Nuclear Plant Hr. Steve J.
Brewer Indiana Michigan Power Nuclear Generation Group 500 Circle Drive
- Buchanan, Michigan 49107 August 1996
I ll 0
- ','0
, February20,
.1997 Mr. E.
E. Fitzpatrick, Vice,President Indiana Michigan Power Nuclear Generation Group 500 Circle Drive
- Buchanan, MI 49107
SUBJECT:
DONALD C.
COOK NUCLEAR PLANT; UNIT NOS.
1 AND 2, CLARIFICATION OF RELIEF REGARDING VT-2 EXAMINATIONS AND CORRECTIVE ACTIONS (TAC NOS.
M97179 AND H97180)
Dear Mr. Fitzpatrick:
Please contact me at (301) 415-3017 if you have any questions regarding the above.
Sincerely, Original signed by:
John B. Hickman, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-315 and 50-316 cc w/encl:
See next page 0 I ST R I BUTION:
Docket File PUBLIC JRoe GMarcus EGAl OGC JCaldwell, RIII GHi11 DOCUMENT NAME:
G:)DCCOOK'ii,C097179.LTR To tecelve e copy of thte doctenent, Indcete In the box; 'C
~ Copy without ettechment/encloetee PD¹ 3-3 Reading ACRS It I
'E','Copy wittt ettechment/encloetve 'N'fo copy By letters dated October 25,
- 1996, and November 27,
Cook Nuclear Plant Units 1
and 2, requested relief for class 1,
2 and 3 systems from the requirements of the 1989 Edition of the ASME Boiler and Pressure Vessel
- Code,Section XI, in regard to VT-2 visual examination of insulated components stated in paragraph IWA-5242(a).
By letter dated January 16, 1997, the staff authorized you to use Code Case N-533 in lieu of the requirements of Subsection IWA-5242(a) of the 1989 Edition of the ASME Code,Section XI until such time as the code case is included in a future revision of Regulatory Guide 1. 147.
Subsequently, your staff questioned the applicability of Code Case N-533, which is specifically written for class 1 systems, to class 2 and 3 systems.
It is the staff's position that the relief we granted you to use Code Case N-533 also applies to the less safety significant class 2 and 3 systems.
Therefore, the alternative requirements of Code Case N-533 may also be applied to the examinations performed on class 2 and 3 systems.
OFFICE PH:PD33 E
LA:PD33 ',t,/
E NAME JHi ckman EBarnhill'ATE a/I +97 9./'.
/97.'FF CIAL RECORD COPY I