ML17333A707
| ML17333A707 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/30/1996 |
| From: | Minor J, Russo M, Sampson J AMERICAN ELECTRIC POWER CO., INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9612170009 | |
| Download: ML17333A707 (7) | |
Text
CATEGORY j REGULATOO INFORMATION DISTRIBUTION +ITEM (RIDE) 4 ACCESSION NBR:9612170009 DOC.DATE: 96/11/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION RUSSO,M.E.
American Electric Power Co., Inc.
MINORFJ.W.
American Electric Power Co., Inc.
SAMPSON,J.R.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Nov 1996 for DC Cook Nuclear Plant Unit 1..W/961203 ltr.
DISTRIBUTION CODE:
ZE22T COPIES RECEIVED:LTR 1
ENCL 1
SIZE:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:
RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AE ILE CEN E EELB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN3 FILE 01 EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMANFJ AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB LITCO BRYCE,J H
NOAC POOREFW.
NUDGCS FULL TXT COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 D
0 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-S(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL 25 N
American Electric Poi~
Cook Nuclear Plant One Cook Place Br dgman, Ml 49t06 6t6 466 690t December 3,
1996 AMERICAN EI.IFCMIC POWM U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of November 1996 is submitted.
Respectfully, J. R.
Sampson Plant Manager Attachment NRC Region III D.R.
Hahn R.C. Callen S.
Hamming INFO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J.
Brewer D. W. Paul S.H. Steinhart D.LE Noble W.HE Schalk D.G. Turner B.L. Bartlett M.E.
Russo
'Pb12170009 9bii30 PDR ADOCK 05000315 R
PDR fGPO30
N.R.C.
OPERATiNG DATA REPORT DOCKET NO.
50-315 DATE 03/Dec/96 COMPLETED BYJohn W. Minor TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit
- 2. Reporting Period NOV/96
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1000 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
This Mo.
Yr. to Date Cumm.
11.
Hours in Reporting Period 720.0 8040.0 192120.0 12.
No. of Hrs. Reactor Was Critical 720.0 7851.0 145843.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0 14.
Hours Generator on Line 720.0 7830.7 143464.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0 16.
Gross Therm.
Energy Gen.
(MWH) 2151217 24114730 423532610 17.
Gross Elect.
Energy Gen.
(MWH) 712700 7934440 137546810
- 18. 'Net Elect.
Energy Gen.
(MWH) 686646 7647199 132325298
- 19. Unit Serv ce Factor 100.0 97.4 75.5
- 20. Unit Availability Factor 100.0 97.4 75.5
- 21. Unit Capacity Fact or (MDC Net) 95.4 95.1 68.7
- 22. Unit Capacity Factor (DER Net) 93.5 93.2 66.9
- 23. Unit Forced Outage Rate 0.0 2.6 6.0 24.
Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
Refuelin outa e to be in Februar 28 1997 for an estimated duration of 48 days.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (NWe-Net)
MONTH DOCKET NO.
50-315 UNIT ONE DATE 03/Dec/96 COt1PLETED BYJohn W. t1;nor TELEPHONE 616-465-5901 NOV/96 DAY 96/11/01 96/!1/02 96/11/03 96/11/04 96/11/05 96/11/06 96/11/07 96/11/08 96/ll/09 96/11/10 96/11/11 96/11/12 96/11/13 96/11/14 96/11/15 96/11/16 AVERAGE DAILY POWER LEVEL 941 939 942 949 949 939 936 929 931 933 935 953 952 953 954 950 DAY 96/'1/17 96/11/18 96/11/19 96/11'""
96/11/2>.
96/11/22 96/11/23 96/11/24 96/11/25 96/11/26 96/11/27 96/11/28 96/11'29 96/11/30 AVERAGE DAILY POWER LEVEL 954 953 953
- 953, 955" 971 974 974 973 975 971 973 973 971
DOCKET NO:
-315 UNIT NAME:
D.C.
Cook Unit 1
COMPLETED BX:
M.E.
Russo TELEPHONE:
616-697-5100 DATE:
December 3,
1996 PAGE:
Page 1 of 1
MONTHLY OPERATING ACTIVITIES NOVEMBER 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 89%
RTP.
Minor adjustments to reactor power were experienced on four occasions as a result of Main Transformer operating limitations.
The unit exited this reporting period in Mode 1 at 93.5%
RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of November was 712700 MWH.
DETAILS 11-04-96 11-06-96 11-11-96 11-22-96 0140 0445 1042 1120 2120 2240 0130 0415 Commenced power ascension.
Reactor power stabilized at 91.5%
RTP.
Commenced power reduction due to Main Transformer operat'ng limitations.
Reactor power stabilized at 90%
RTP.
Commenced power ascension.
Reactor power stabilized at 92%
RTP.
Commenced power ascension.
Reactor power stabilized at 93.5%
RTP.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 1996 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
50-315 D.C.
COOK UNIT 1'ecember 3,
1996 M.E. Russo 616-697-5100 Page 1 of 1
DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE~
TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions this month.
1 F
S Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain)
Exhibit G Instructions
.for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:
Same Source
O.
)lx