Monthly Operating Rept for Aug 1996 for DC Cook Nuclear Plant Unit 2
ML17333A560
Person / Time
Site: Cook 
Issue date: 08/31/1996
From: Minor J, Russo M, Sampson J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9609180011
Download: ML17333A560 (8)


Text

CATEGORY 1 REGULAT'NFORMATION DISTRIBUTION+STEM (RIDE)

ACCESSION NBR:9609180011.

DOC.DATE: 96/08/31 NOTARIZED: NO FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.

American Electric Power Co., Inc.

RUSSO,M.E.

American Electric Power Co., Inc.

SAMPSON,J.R.

American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION DOCKET ¹ 05000316

SUBJECT:

Monthly operating rept for Aug 1996 for DC Cook Nuclear Plant Unit 2.W/960904 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J E CENTER 01 RGN3 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REC 'IRED':

LTTR 9, ENCL'9

J'

American ElectricP~

Cook Nuclear Plant One Cook Place Bridgman, Ml49106 6164655901 September 4,

1996 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald'.

Cook Nuclear Plant Unit 2 Technical Specification 6 '.1.10, the attached Monthly Operating Report for the month of August 1996 is submitted.

e pectfully, J.R.

Sampson Plant Manager Attachment C'RC Region III D.R.

Hahn R.C. Callen S.

Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.AD Barrett W.G ~ Smith, Jr.

S.J.

Brewer D. W. Paul S.H. Steinhart D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E.

Russo 9b09i800ii 9b083i PDR ADQCK 050003ib R

PDR

gpss,

N.R.C.

OPERATXNG DATA REPORT DOCKET NO.

50-316 DATE 04/Sep/96 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period August 1996
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted.

Xf Any (Net MWe) 10.

Reasons For Restrictions.

Xf Any:

11

'2.

13.

14.

15.

16

~

17.

18

'9.

20.

21.

22.

23.

24.

Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Therm. Energy Gen.

(MWH)

Gross Elect.

Energy Gen.

(MWH)

Net Elect. Energy Gen.

(MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 744.0 5856.0 744.0 4759.6 0.0 0.0 744.0'713.9 0.0 0 '

2534428 15653690 807720 5074280 780735 4904443 100 '

80.5 100.0 80.5 99.0 79.0 96.3 76.8 0.0 0.2 Months (Type, Date,and Cumm.

163632.0 113083.9 0.0 109519.6 0.0 337288154 109280640 105264406 67.9 67.9 61.5 59.9 14.5 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 04/Sep/96 COMPLETED BY JW Minor TELEPHONE 616-465-5901 DAY MONTH August 1996 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAIl Y POWER LEVEL 96/08/01 96/08/02 96/08/03 96/08/04 96/08/05 96/08/06 96/08/07 96/08/08 96/08/09 96/08/10 96/08/11 96/08/12 96/08/13 96/08/14 96/08/15 96/08/16 1045 1040 1053 1035 1042 1036 1030 1031 1038 1063 1078 1088 1082 1048 1036 1035 96/08/17 96/08/18 96/08/19 96/08/20 96/08/21 96/08/22 96/08/23 96/08/24 96/08/25 96/08/26 96/08/27 96/08/28 96/08/29 96/08/30 96/08/31 1035 1037 1032 1030 1026 1025 1037 1073 1069 1062 1064 1067 1070 1064 1059

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.C.

Cook Unit 2 M.E.

Russo 616-697-5100 September 4,

1996 Page 1 of 1

MONTHLY OPERATING ACTIVITIES AUGUST 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%

RTP.

The unit exited this reporting period in Mode 1 at 100%

RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves'ross electrical generation for the month of August was 807720 MWH.

DETAILS No details to report.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: AUGUST 1996 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

50-316 D.C.

COOK ~JNIT 2 September 4,

1996 M.E. Russc 616-697-5100 Page 1

OF 1

DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100%

RTP this month.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:

Same Source

g7 w

~

cv L

Ik