,REGULATOR INFORMATION DISTRIBUTION ~STEM (RIDS)

'I ACCESSION NBR:9606140380

'OC.DATE: 96/05/31 NOTARIZED: NO FACIL:50-316 Donald'C.

Cook Nuclear Power Plant, Unit 2, Indiana M

AUTH.NAME" AUTHOR AFFILIATION TURNER,D.G.=-,

American Electric Power Co., Inc.

RUSSO,M.E.

American Electric Power Co., Inc.

SAMPSON,J.R.

American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION SUBJECT.:'Monthly operating rept for May 1996 for DC Cook Nuclear Plant Unit 2.W/960603 ltr-.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per'ech Specs)

NOTES:

DOCKET I 05000316 E

RECIPIENT ID CODE/NAME'D3-1 PD k

'INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

...1 1

1 l.

1-1 1

1 "1

RECIPIENT'D CODE/NAME HIC E CEN RGN3 NOAC COPIES LTTR ENCL 1

1 1

1 1

1',

1

'R D

0 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP

'(JS TO REDUCE WASTE l CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D-5(EXT. 415-2083)

TO'ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'.NEEDI

'OTAL.NUMBER OF.:COPIES. REQUIRED:

LTTR,,.9"".ENCL,'.

9

lr

American ElectricP~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 June 3,

1996 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of May 1996 is submitted.

Respectfully, J.R.

Sampson Plant Manager Attachment Department c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming INPO Records Center ANI Nuclear Engineering E.E. Fitzpatrick A.A. Blind P.A. Barrett W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett D.G. Turner W.H. Schalk M.E. Russo

, (ir,063 9606i40380 '&0531 PDR ADOCK 050003i6 R

PDR

0 I

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 03/Jun/96 COMPLETED BY D G Turner TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period May 1996 notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 744.0 3648.0 579.6 2551.6 0.0 0.0 533.9 2505.9 0.0 0.0 1556210 8134351 499410 2655610 480777 2565411 71.8 68.7 71.8 68.7 61.0 66.3 59.3

64. 5 1.9 0.4 Months (Type, Date,and Cumm.

161424.0 110875.9 0.0 107311.6 0.0 329768815.

106861970 102925374 67.5 67.5 60.9 59.4 14.8 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO.

50-316 UNIT TWO DATE 03/Jun/96 COMPLETED BY' G Turner TELEPHONE 616-.465-5901 May 1996 DAY 96/05/01 96/05/02 96/05/03 96/05/04 96/05/05 96/05/06 96/05/07 96/05/08 96/05/09 96/05/10 96/05/11 96/05/12 96/05/13 96/05/14 96/05/15 96/05/16 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 142 124 290 414 473 507 824 1043 DAY 96/05/17 96/05/18 96/05/19 96/05/20 96/05/21 96/05/22 96/05/23 96/05/24 96/05/25 96/05/26 96/05/27 96/05/28 96/05/29 96/05/30 96/05/31 AVERAGE DAILY POWER LEVEL 1090 1021 1091 1080 1080 1079 1077 1078 1087 1087 1091 1089 1090 1090 1084

~

~

D.C.

Cook Unit, 2

M.E. Russo 616-465-5901 June 3,

1996 Page 1 of 2 DOCKET NO:

50-316 UNIT NAME'OMPLETED BY:

TELEPHONE:

DATE; PAGE:

MONTHLY OPERATING ACTIVITIES MAY 1996 HIGHLIGHTS*

The unit entered this reporting period in Mode 5 at 0%

RTP for the Cycle 10 to 11 refueling/maintenance outage.

The Reactor was taken critical May 7 at 0701 for the first time in fuel cycle 11.

A Reactor trip occurred May 8 at 1044 during Main Turbine overspeed testing.

The automatic scram from 7%

RTP resulted when the anticipated trip of the Main Turbine was coincident with one channel of Main Turbine impulse pressure indicating greater than 10%.

The Main Turbine Generator was paralleled to the grid May 9 at 0732.

The Main Turbine Generator was removed from the grid May 10 at 1532 to facilitate Main Transformer phase one oil leak repairs.

Following the minor leak repair the Main Turbine Generator was paralleled to the grid May 11 at 0207.

The unit exited this reporting period in Mode 1 at 100%

RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of May was 499410 MWH.

DETAILS*

05-03-96 05-04-96 05-07-96 05-08-96 1330 0824 0041 0420 0701 0420 0705 1000 1044 Entered Reactor Mode 4, Entered Reactor Mode 3.

Commenced Reactor start-up.

Entered Reactor Mode 2.

Reactor critical.

Entered Reactor Mode 1.

Main Turbine reset.

Commenced Main Turbine overspeed testing.

Reactor trip.

p

~

DOCKET NO'0-316 UNIT NAME:

D.C.

Cook Unit 2 COMPLETED BY:

M.E. Russo TELEPHONE:

616-465-5901 DATE:

June 3,

1996 PAGE:

Page 2 of 2 MONTHLY OPERATING ACTIVITIES MAY 1996 DETAILS* (cont'd) 05-09-96 0009 0142 0255 05-08-96 2325 Commenced Reactor start-up.

Reactor critical.

Entered Reactor Mode 1.

Main Turbine reset.

05-10-96 05-11-96 05-13-96 05-15-96 05-16-96 0732 1030 1050 1111 1532 0207 0306 1945 0930 1645 1625 Main Turbine Generator paralleled to the grid.

Reactor power at 30$ RTP.

Terminated power escalation to facilitate Main Transformer phase one oil leak repairs.

Commenced power reduction to less than 10%

RTP.

Removed Main Turbine Generator from the grid.

Main Turbine Generator paralleled to the grid.,

Reactor power at 22% RTP.

Reactor power at 488 RTP.

Reactor power at 57% RTP.

Reactor power at 90% RTP.

Reactor power at 100%

RTP.

  • All time entries above are Eastern Standard Time (EST).

UNIT SHUTDOWNS AND POWER REDUCTiONS REPORT MONTH: MAY 1996 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

4 50-316 D.C.

COOK UNIT 2 June 3,

1996 M.E. Russo 616-465-5901 Page 1 OF li METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE HOURS REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE 250 032396 S

251 051096 F

199.5 10.6 B,C N/A 96-005 N/A N/A N/A N/A N/A The Unit was removed from service 032396 at 0357 EST for cycle 10 to 11 refueling/maintenance outage.

Prior to grid parallel, an automatic Reactor trip occurred 050896 at 1044 EST during Main Turbine overspeed testing.

The anticipated trip of the Main Turbine was coincident with an unanticipated channel of Main Turbine impulse pressure indicating

>10%. All outage activities were completed and the Main Generator was paralleled to the grid 050996 at 0732 EST. Total length of the refueling outage was 1131.6 hrs.

The Turbine Generator was removed from sezvice 051096 at 1532 EST to facilitate an oil leak repair on phase one of the Main Transformer.

The Turbine Generator was paralleled to the grid 051196 at 0207 EST.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Erzor (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:

Same Source

1

~

~