ML17333A448
| ML17333A448 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/30/1996 |
| From: | Sampson J, Doreen Turner INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9605140286 | |
| Download: ML17333A448 (7) | |
Text
1 I 4/
ACCESSIO'5f NPR,'ACIL:50-316 AUTH.NAME TURNER,D.G.
SAMPSON,J.R.
RECIP.NAME CATEGORY j.
REGULATO INFORMATION DISTRIBUTION STEM (RIDS) 9605140286 DOC.DATE: 96/04/30 NOTARIZED: NO DOCKET Donald C.
Cook Nuclear Power Plant, Unit -2, Indiana M
05000316 AUTHOR AFFILIATION Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Apr 1996 for DC Cook Nuclear Plant Unit 2.W/960501 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR, ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME HICKMAN,J COPIES LTTR ENCL 1
-1 INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL LITCO BRYCE g J H
NRC PDR 1
1 1
1
'1 1
1 1
RGN3 NOAC Mrs 0
1 1
1 1
1 1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 41S"2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
'ENCL 9 *',".,
American ElectricP~
Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 May 1, 1996 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook NQclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1996 is submitted.
Respectfully, J.RE Sampson Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett 140133 M.E. Russo 9605i40286 960430 PDR ADOCK 050003ih R
)//$7
'I
)
'0
~ 4
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 01/May/96 COMPLETED BY D G Turner TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period April 1996 notes
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
'22.
.23-24.
Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Therm.
Energy Gen.
(MWH).
Gross Elect.
Energy Gen.
(MWH)
Net Elect. Energy Gen.
(MWH)
Unit Service Factor Unit 'Availability Factor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 720.0 2904.0 0.0 1972.0 0.0 0.0 0
~ 0 1972.0 0.0 0.0 0
6578141 0
2156200 0
2084634 0.0 67.9 0.0 67.9 0.0
- 67. 7 0.0 65.9 N/A 0.0 Months (Type, Date,and Cumm.
160680.0 110296.3 0.0 106777.7 0.0 328212605 106362560 102444597 67.5 67.5 60.9 59.4 14.8 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
Ma 9
1996 26 'nits in Test Status (Prior to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE Ol/May/96 COMPLETED BY D G Turner TELEPHONE 616-465-5901 Apri1 1996 DAY 96/04/01 96/04/02 96/04/03 96/04/04 96/04/05 96/04/06 96/04/07 96/04/08 96/04/09 96/04/10 96/04/11 96/04/12 96/04/13 96/04/14 96/04/15 96/04/16 AVERAGE DAILY POWER LEVEL DAY 96/04/17 96/04/18 96/04/19 96/04/20 96/04/21 96/04/22 96/04/23 96/04/24 96/04/25 96/04/26 96/04/27 96/04/28 96/04/29 96/04/30 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0,
0 0
0
DOCKET NO:
50-316 UNIT NAME:
D.CD Cook Unit 2 COMPLETED BY:
M.E. Russo TELEPHONE:
616-465-5901 DATE:
May 1, 1996 PAGE:
Page 1 of 1
MONTHLY OPERATING ACTIVITIES APRIL 1996 HIGHLIGHTS*
The unit entered this reporting period in Mode 6 at 0%
RTP for the Cycle 10 to ll refueling/maintenance outage.
Fuel off-load was completed April 6 at 0325.
An Unusual Event was voluntarily declared April 14 at 0900 when both Unit 2 Emergency Diesel Generators were electively removed from service for maintenance activities.
Unit 2 was in Mode 6 and the core unloaded for the duration of the event.
The Unusual Event was terminated April 21 at 0820.
Refueling core alterations was completed April 27 at 0451.
Mode 5 entry occurred April 29 at 1715.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of April was 0
MWH.
DETAILS*
04-03-96 0819 Commenced Reactor fuel off-load core alterations.
04-06-96 04-14-96 04-21-96 04-23-96 04-27-96 04-29-96 0325 0900 0820 1209 0451 1715 Core alterations complete. All fuel off-loaded to the Spent Fuel Pool.
Unusual Event declared due to both Unit 2 Emergency Diesel Generators being inoperable.
Unusual Event terminated.
Commenced Reactor refueling core alterations.
Completed Reactor refueling core alterations.
Entered Reactor Mode 5.
- All time entries above are Eastern Standard Time (EST)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: APRIL 1996 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
50-316 D.C.
COOK UNIT May 1, 1996 M. E.
Russo
'16-465-5901 Page 1 OF,1 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE 250 032396 S
720.0 B,C N/A N/A N/A The Unit remained shutdown for the cycle 10 to 11 maintenance/refueling outage throughout this reporting period.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
~ 4:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I: