MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
CATEGORY 1
.,., ,., .....,e,,.
,ACCESSiON NBR:9604150143 DOC.DATE: 96/04/08 NOTARIZED: NO DOCKET I FACIE:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 050003'5 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME. RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards request for exemption from 10CFR70.24 -re criticality monitoring requirements.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 5R Submittal: General Distribution NOTES:
RECIPIENT COPIES RECIPIENT COPIES I:D CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1 PD3-1 PD 1 1
~H/CKMAN,J 1 1 INTERN . ILE C 1 1 NRR/DE/EMCB 1 1 NRR DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK/
ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDf
..OTA'UMBER, OF COPIES REQUIRED: 'TR 12 ENCL ll
~ '. t Indiana Michigan Power Company PO Box 16631 Columbus, OH 4321 6 INOIANA NICHl6AR POWER April 8, 1996 AEP:NRC:1156A Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
Donald C. Cook Nuclear Plant Units 1 and 2 REQUEST FOR EXEMPTION FROM 10CFR70.24 CRITICALITY MONITORING REQUIREMENTS Pursuant to the requirements of 10CFR50.12, 10CFR70.14(a),
10CFR70.24(d), and the guidance contained in NRC Regulatory Guide 8.12, we hereby request an exemption from the requirements of 10CFR70.24. 10CFR70.24 requires, in part, a criticality alarm system in each area in which special nuclear material is handled, used or stored, and the performance of drills to familiarize personnel with the evacuation plan. The attachment to this letter contains the exemption request with an evaluation that: justifies the exemption. This requested exemption is similar to the one previously granted within Donald C. Cook Nuclear Plant Unit 2 Special Nuclear Material License (SNM-1753).
Sincerely,
~E.Vice President E. Fitzpatrick eh Attachment
. CC: A. A. Blind G. Charnoff H. J. Miller NFEM Section Chief NRC Resident Inspector - Bridgman J. R. Padgett oot 9~0eisoiea 9woe08 PDR ADOCK 05000315 P PDR
ATTACHMENT TO AEP: NRC: 1156A DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 REQUEST FOR EXEMPTION TO 10CFR70.24
ATTACHMENT TO AEP:NRC'1156A' Page 1"
'XEMPTION RE VEST I. BACKGROUND This proposed exemption request applies to 10CFR70.24.
10CFR70.24(a) states the requirements for a monitoring system that will energize clearly audible alarms if accidental criticality occurs in each area in which special nuclear material (SNM) is handled, used or stored. Also, 10CFR70.24(a) requires that emergency procedures be maintained for each area in which licensed SNM is handled, used, or stored to ensure that all personnel withdraw to an area of safety upon the sounding of the alarm.
These procedures must include the conduct of drills to familiarize personnel with the evacuation plan, designation of responsible individuals for determining the cause of the alarm, and placement of radiation survey instruments in accessible locations for use in such an emergency.
This exemption would be similar to one previously granted within Cook Nuclear Plant's Special Nuclear Material License No. SNM-1753, which was issued on August 18, 1977. This exemption was not explicitly included with the issuance of the operating license for Cook Nuclear Plant Unit 2, II. JUS IFICATION FOR GRANTING THE EXEMPTION RE UESTS The specific requirements for granting exemptions from Part 70 regulations are set forth in 10CFR70.24(d) and 10CFR70.14(a).
Section 70.24(d) anticipates that licensees may need relief from the requirements of 10CFR70.24(a) and allows licensees to apply for an exemption from 10CFR70.24, in whole or in part, if "good cause" is shown. Cook Nuclear Plant believes that good cause exists based on the positions presented below in the context of the requirements of 10CFR70.14(a).
Under Section 70.14(a), the Commission is authorized to grant an exemption upon a demonstration that the exemption: (A) is authorized by law; (B) will not endanger life or property or the common defense and security; and (C) is in the public interest.
The following justifications address each of these requirements and demonstrate that the Commission should grant the requested exemption.
A. The Exem tion Is Authorized B Law The Commission's authority to grant requests for exemptions from its regulations has existed since 1956. The particular authority to grant exemptions from the requirements of Part 70 was codified in 10CFR70.14 in 1972. See 37 Federal
ATTACHMENT TO AEP'NRC:1156A Page 2 Register 5745, 5749 (March 21, 1972). Therefore, exemption requests are explicitly authorized under NRC regulations.
B. The Exem tion Will Not Endan er Life Or Pro ert Or The Common Defense And Securit An exemption request will not endanger life or property or the common defense and security if it can be shown that the request meets the statutory standard of adequate protection to the health and safety of the public. Furthermore, to ensure the common defense and security are not endangered, the exemption request must demonstrate that the loss or diversion of SNM is precluded. In light of these standards, we describe below how the use, storage, and handling of SNM at Cook Nuclear Plant provides adequate protection to the health and safety of the public, and precludes against loss or diversion of SNM. In particular, we focus on the following points: design, characteristics, and existing accident analyses.
Use of SNM SNM is present principally in the form of nuclear fuel.
However, other quantities of SNM are used (and stored) at Cook Nuclear Plant in the form of fissile material incorporated into primarily fission chamber detectors and movable miniature neutron flux detectors. The small quantity of SNM present in these detectors, and the form in which the SNM is used and stored precludes an inadvertent criticality. The facilities are exempt from Section 70.24(b) for SNM "used or to be used in the reactor" pursuant to Section 70.24(c). Thus, the focus of the exemption request is directed only toward the requirements of 70.24(a).
Inadvertent or accidental criticality in the reactor vessel is precluded through compliance with the facility technical specifications, including reactivity requirements (e. g., shutdown margins, limits on control rod movement), instrumentation requirements (e.g.,
power and radiation monitors), and controls on refueling operations (e.g., refueling boron concentration and source range monitor requirements).
In addition, the operators'ontinuous attention directed toward instruments monitoring behavior of the nuclear fuel in the reactor assures that the facility is operated in such a manner as to preclude inadvertent criticality. Finally, since access to the fuel in the reactor vessel is not physically possible while in use and is procedurally controlled during refueling (see
ATTACHMENT TO 'AEP: NRC: 1156A Page 3 Section II.B.3 below), there are no concerns associated with loss or diversion of the fuel.
Therefore, the requirements of Section 70.24(a) are not necessary for SNM in the form of nuclear fuel while used in the reactor vessel, and thus, granting this exemption will not endanger life or property or the common defense and security.
- 2. Stora e of SNM SNM, as nuclear fuel, is stored in either the spent fuel pool or the new fuel vault. The spent fuel pool is used to store irradiated fuel under water after its discharge from the reactor and new fuel prior to loading into the reactor.
The spent fuel pool is designed to store the fuel in a geometric array that precludes criticality. In addition, existing technical specification limits on the effective neutron multiplication factor, k,<<, are maintained less than or equal to 0.95.
The new fuel vault may be used to receive and store new fuel in a dry condition upon arrival on site and prior to loading in the reactor or spent fuel pool. The acceptance criteria for criticality requires k,<< to be less than or equal to 0.95, including uncertainties, under full water density flooded conditions and less than or equal to 0.98 under optimum moderation conditions. Analyses conforming to NRC Standard Review Plan Section 9.1.1, "New Fuel Storage," have shown that the Cook Nuclear Plant fresh fuel storage racks will meet the above acceptance criteria. A copy of these analyses was submitted to the NRC on December 8, 1989, as submission AEP:NRC:1071F. The technical specification changes that were submitted based on these analyses were approved in Amendments 136 and 121 to the licenses for Units 1 and 2, respectively, in a letter dated May 17, 1990.
On February 26, 1996, additional analyses were forwarded to you as submission AEP:NRC:1071U. These new analyses were performed to support an increase in the Technical Specification 5.6.2 limit on nominal fuel assembly enrichment for new, Westinghouse-fabricated fuel stored in the new fuel storage racks. The current nominal limit for Westinghouse fuel is 4.55 weight percent (w/o) uranium-235 isotope (U-235). The proposed nominal limit is 4.95 w/o U-235, provided that
ATTACHMENT TO AEP: NRC: 1156A Page 4
the fuel assembly contains sufficient zirconium diboride integral fuel burnable absorber (IFBA) material to maintain the maximum reference fuel assembly K less than or equal to 1.4857 at 68'F.
Approval for this submission has not yet been received.
Furthermore, it should be noted that an accidental criticality monitoring system does not ensure against the loss or diversion of SNM material; consequently, the absence of such a system does not affect the capability of Cook Nuclear Plant to ensure SNM is safeguarded.
Therefore, the requirements of Section 70.24 are not necessary for the SNM stored in the new fuel vault or spent fuel pool, and thus, granting this exemption will not endanger life or property or the common defense and security.
- 3. Handl in of SNM Both irradiated and.unirradiated fuel is moved between the new fuel vault, the reactor vessel, and the spent fuel pool to accommodate refueling operations. In addition, fuel is moved into the facility and within the reactor vessel or within the spent fuel pool. In all cases, fuel movements are procedurally controlled and designed to preclude conditions involving criticality concerns. In addition, the technical specifications specifically address the refueling operations and limit the handling of fuel to ensure against an accidental criticality. The technical specifications also preclude certain movements over the spent fuel pool and provide for minimum boron requirements in the spent fuel pool to prevent an inadvertant criticality.
Moreover, previous accident analyses have demonstrated that a fuel handling accident (i.e., a dropped fuel element) will not create conditions which exceed acceptance criteria. The analysis uses the ANSI N16.1 double contingency principle that one is not required to assume two unlikely, independent, concurrent events to ensure protection against a criticality accident.
If a fuel assembly is dropped in the spent fuel pool, the boron concentrations required by Cook Nuclear Plant Technical Specifications will limit the resulting K,<<
to less than 0.95.
0 C ATTACHMENT TO AEP:NRC: 1156A Page 5 While movement of nuclear fuel presents a potential opportunity for its loss or diversion, the existing procedural controls also ensure SNM handling is authorized and monitored. Similarly, the absence of an accidental criticality monitoring system does not affect the capability of Cook Nuclear Plant to ensure SNM is safeguarded.
Therefore, the requirements of Section 70.24 are not necessary for the handling of SNM, and thus, granting this exemption will not endanger life or property or the common defense and security.
The Exem tion Re uests Are In The Public Interest The guidance provided in Section C.l of Regulatory Guide 8.12, "Criticality Accident Alarm Systems," Rev. 2 (October 1988) states:
"Section 70.24 of 10CFR Part 70 requires alarm coverage in each area 'in which such licensed special nuclear material is handled, used or stored . . .,'hereas paragraph 4.2.1 of the standard states that the need for criticality alarms must be evaluated for such areas.
evaluation does not determine that a If such an otential for criticalit exists as for example where the quanti,ties or form of special nuclear -material make criticality practically impossible or where geometric spacing is used to preclude criticality, such as in some storage spaces for unirradiated nuclear plant fuel, a ro riate to re uest an exem tion rom it is
~02d." [Emphas5.s added. ]
This language implies that where a licensee determines that design and/or procedural safeguards ensure against conditions of accidental criticality, compliance with Section 70.24(a) would not serve the underlying purpose of the regulation.
As discussed above in Section II.B, the design of and safety analyses for the spent fuel pool and new fuel vault, as well as the associated procedural control and technical specification requirements, ensure that conditions of accidental criticality are precluded. Therefore, the application of Section 70.24 to Cook Nuclear Plant facilities would not serve and is not necessary to achieve the underlying purpose of this requirement.
ATTACHMENT TO AEP:NRC: 1156A Page 6 The continued maintenance of a criticality accident monitoring system would require a considerable expenditure of resources. These expenses would include the operation and maintenance of the system for the life of Cook Nuclear Plant, as well as the planning and conducting of drills specifically designed to respond to a criticality accident that has been shown by analysis not to be credible. In light of the purpose of an accidental criticality monitoring system, these expenditures could otherwise be put to better use improving the operation of Cook Nuclear Plant. Therefore, Cook Nuclear Plant concludes that compliance with Section 70.24 would result in an undue hardship and other costs that are significantly in excess of those likely contemplated when this regulation was adopted.
It is our understanding that exemptions from the requirements of Section 70.24(a) have previously been granted to Part 50 licensees. As an example, the Haddam Neck Plant and the Millstone Nuclear Power Station were granted an exemption from Section 70.24(a). The approval for the exemption was published in the Federal Register on October 29, 1991 (see 56CFR209 page 55695). Therefore, we conclude that since Cook Nuclear Plant is similar to other facilities granted such an exemption, compliance with Section 70.24(a) would create an undue hardship and other costs significantly in excess of those incurred by others similarly situated.
Continued monitoring based on the guidance in 10CFR70.24 is unnecessary because of the lack of a credible accident that would produce a criticality. The burden of criticality monitoring for new and spent fuel limits Cook Nuclear Plant resources that could be better used to augment the safe operation of the plant in other areas. Consequently, the exemption request is in the public interest and should be granted pursuant to Section 70.14(a).
III. CONCLUSION Because an exemption from the requirements of 10CFR70.24 for Cook Nuclear Plant is authorized by law, will not endanger life or property or the common defense and security, is in the public interest, and is requested for good cause, we respectfully submit that, in accordance with the requirements of 10CFR70.14(a) and 70.24(d), the NRC should grant the requested exemption.