CATEGORY 1 REGULATE.
INFORMATION DISTRiBUTION rSTEM (RIDS) m ACCESSiON 'NBR:9604120049 DOC.DATE: 96/03/31 NOTARIZED: NO DOCKET I FACIL:50-316 Donald C.
Cook Nuclear Power Plant., Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR-AFFILIATION TURNER,D.G.
Ipdiana Michigan Power Co. (formerly Indiana
& Michigan Ele RUSSO,M.E.
Indiana Michigan Power Co. (formerly Indiana s Michigan Ele SAMPSON,J.R.
(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT 'AFFILIATION
SUBJECT:
Monthly operating rept for Mar 1996 for DC Cook Nuclear Plant Unit 2.W/960401 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAl: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN J ILE CENTER llS NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL ', 9
0
American ElectricP~
Cook Nuclear Plant~
One Cook Place Bndgman, Ml49t06 6l6 465 5901 April 1, 1996 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1996 is submitted.
Respectfully, Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett W. G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett D.G. Turner W.H. Schalk M.E. Russo 9b04120049 9b0331 PDR ADOCK 050003ib R
" 3;20923
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 01/Apr/96 COMPLETED BY D G Turner TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period Mar 1996
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133 5.
Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
Hours in Reporting Period, 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH) 18.
Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 744.0 2184.0 532.0 1972.0 0.0 0.0 532.0 1972.0 0.0 0.0 1679194 6578141 546530 2156200 527402 2084634 71.5 90.3 71.5 90.3 66.9 90.0 65.0 87.6 0.0 0.0 Months (Type, Date,and Cumm.
159960.0 110296.3 0.0 106777.7 0.0 328212605 106362560 102444597 67.8 67.8 61.2 59.7 14.8 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
Mav 6
1996
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast 1NITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE 01/Apr/96 COMPLETED BY D G Turner TELEPHONE 616-465-5901 Mar 1996 DAY 96/03/01 96/03/02 96/03/03 96/03/04 96/03/05 96/03/06 96/03/07 96/03/08 96/03/09 96/03/10 96/03/11 96/03/12 96/03/13 96/03/14 96/03/15 96/03/16 AVERAGE DAILY POWER LEVEL 1079 1079 1081 1077 1080 1071 1080 1080 1080 1081 1076 1080 1065 1041 1019 961 DAY 96/03/17 96/03/18 96/03/19 96/03/20 96/03/21 96/03/22 96/03/23 96/03/24 96/03/25 96/03/26 96/03/27 96/03/28 96/03/29 96/03/30 96/03/31 AVERAGE DAILY POWER LEVEL 992 916 889 870 798 451 31 0
0 0
0 0
0 0
0
DOCKET NO:
50-316 UNIT NAME:
D.CD Cook Unit 2 COMPLETED BY:
M.E. Russo TELEPHONE'16-465-5901 DATE;
April 1, 1996 PAGE:
Page 1 of 1
MONTHLY OPERATING ACTIVITIES MARCH 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%
RTP.
Commenced Rea'ctor power coastdown March 13, 1996 at 0000 in, preparation for refueling outage.
Reactor power was stabilized at 55%
March 21, 1996 at 2321 for Steam Generator safety valve testing.
The unit was removed from service on March 23, 1996 at 0357 for the cycle 10 to 11 refueling/maintenance outage.
The unit exited this reporting period in Mode 6 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of March was 546530 MWH.
DETAILS 03-13-96 03-21-96 03-22-96 0000 2321 1005 Commenced Reactor power coastdown in preparation for refueling outage.
Reactor power stabilized at 55%
RTP to conduct Steam Generator safety valve testing.
Testing complete.
Commenced Reactor power coastdown.
03-23-96 0357 Manual Reactor trip from 20%
RTP for Rod Control system testing and commencement of cycle 10 to 11 refueling outage.
Entered Reactor Mode 3.
03-24-96 03-30-96 0415 1750 1245 Entered Reactor Mode 4.
Entered Reactor Mode 5.
Entered Reactor Mode 6.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MARCH 1996 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
50-316 D.C.
COOK UNIT 2 April 1, 1996.
M.E. Russo 616-465-5901, Page 1 OF 1
DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT REPORT NO.
SYSTEM CODE COMPONENT CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 250 032396 S
212.1 B,C N/A N/A N/A The Reactor was manually tripped from 20%
RTP for Rod Control system testing and commencement of the cycle 10 to 11 refueling outage on 032396 at 0357 hours0.00413 days <br />0.0992 hours <br />5.902778e-4 weeks <br />1.358385e-4 months <br />.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error '(Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3: