Forwards Insp Repts 50-315/96-02 & 50-316/96-02 on 960117- 0226 & Notice of Violation
ML17333A403
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/02/1996
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17333A404 List:
References
NUDOCS 9604090040
Download: ML17333A403 (6)


See also: IR 05000315/1996002

Text

April 2,

1996

Mr. E.

E. Fitzpatrick

Senior Vice President

Nuclear Generation

Indiana Michigan Power

Company

1 Riverside

Plaza

Columbus,

OH

43216

SUBJECT:

INTEGRATED INSPECTION

REPORT 50-315/316-96002(DRP)

AND NOTICE OF VIOLATION

Dear

Mr. Fitzpatrick:

This refers to the routine safety inspection

conducted

by Messrs.

B. Bartlett,

D. Hartland,

C. Orsini,

and

C. Osterholtz of this office from January

17,

1996, through February

26,

1996.

The inspection

included

a review of

activities at your Donald C.

Cook Nuclear Plant,

Units

1 and 2.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and interviews with personnel.

This

report represents

an integrated

product of a number of inspections

conducted

during the inspection period.

The summary contained

in the report provides

an

overview of our assessment

of your performance

in the functional

areas

inspected.

Based

on the results of this inspection,

the

NRC has determined that

two'iolations

of NRC requirements

occurred.

The violations are cited in the

enclosed

Notice of Violation (Notice)

and the circumstances

surrounding

them

are described

in detail in the subject inspection report.

The violations are

of concern

because

they represent

a failure to recognize

the requirement to

meet

a regulation for criticality monitoring of new reactor fuel

and the

failure to ensure

a temporary modification did not represent

an unreviewed

safety question prior to installation.

In addition,

we continue to observe

problems regarding

inadequate

safety

evaluations,

improper implementation of Technical Specification action

statements,

foreign material

exclusion,

secondary

plant material condition,

the quality of auxiliary operator

rounds,

procedural

adherence,

and

human

performance.

These

problems

have

been discussed

in previous inspections.

During

a management

meeting

on January

11,

1996, your staff described

the

programs that you had

implemented to improve

human performance

and to resolve

the problems

observed

by the

NRC.

We plan to monitor these activities during

future

NRC inspections.

Ps

g

9604090040

960402

PDR

ADOCK 050003i5

8

PDR

>or

E.

E. Fitzpatrick

You are required to respond

to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previous docketed

correspondence, if the correspondence

adequately

addresses

the required response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosures,

and your response will be placed in the

NRC

Public Document

Room (PDR).

To the extent possible,

your response

should not

include any personal

privacy, propriety, or safeguards

information so that it

can

be placed in the

PDR without reduction.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely yours,

Docket No. 50-315

Docket No. 50-316

/s/W. L. Axelson, Director

W. L. Axelson, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No.

50-315/96002 (ORP);

50-316/96002(DRP)

cc w/encl:

A. A. Blind, Site Vice President

John

Sampson,

Plant Hanager

James

R. Padgett,

Hichigan Public

Service

Commission

Hichigan Department of

Public Health

See attached

continued distribution

C

il'

E. fitzpatrick

3

Continued Distribution:

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

SRI D.

C.

Cook w/encl

RHB/FEES w/o encl

DRP w/encl

RIII PRR w/encl

D.

C. Cook,

PH,

NRR w/encl

IPAS (E-Hail) w/encl

A. B. Beach,

w/encl

Document:

R:~insprpts~powersgcookgdcc96002.drp

To rw'eave

~ copy of thea decent,

fndlcate

1n the hox

C

Copy ufthout attach/encl

f.

Copy ulth attach/encl

H

OFFICE

RI II

Ja,w

d

DATE

03/

9

RIII

Kro

/

6

03

96

OFFICIAL RECORD

COPY

V

ft