CATEGORY 1 REGULRTN'NFORMATION DISTRIBUTIOhOYSTEM (RIDE)
ACCESSION NBR:9603140132 DOC.DATE: 96/02/29 NOTARIZED:
NO DOCKET I )
FACIL:50..;.,)16,Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RUSSO,M.E.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele SAMPSON,J.R.
Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIP.NAME RECIPIENT. AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1996 for DC Cook Nuclear Plant Unit 2.W/960304 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME HICKMAN,J COPIES LTTR ENCL 1
'1 INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 1
1 1
1 RGN3 NOAC CEN ER 1
1 1
1 1
1 1
D U
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKg ROOM OWFN SD-5(EXT. 415-2083)
TO ELXMXNATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAl. NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
0 0
I
,4
March 4, 1996 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1996 is submitted.
Respectfully, J.R.
Sampson Plant Manager Attachment c:
3 4CC58 NRC Region III D.R.
Hahn R.C. Callen S.
Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett D.G. Turner W.H. Schalk M.E. Russo 9603140i32 960229 PDR ADQCK 05000316 R
l IE o ll
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 04/Mar/96 COMPLETED BY D G Turner TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period Feb 1996
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. 1f Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH) 18.
Net Elect.= Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six Refuelina outa e to be in March of 50 da s.
This Mo.
Yr. to Date Cumm.
696.0 1440.0 159216.0 696.0 1440.0 109764.3 0.0
~ 0.0 0.0 696.0 1440.0 106245.7 0.0 0.0 0.'0 2368088 4898946 326533411 776520 1609670 105816030 751318 1557232 101917195 100.0 100.0 67.8 100.0 100.0 67.8 101.8 102.0 61.2 99.0 99.2 59.6 0.0 0.0 14.9 Months (Type, Date,and Duration):
23 1996 for an estimated duration
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE 04/Mar /96 COMPLETED BY D G Turner TELEPHONE 616-465-5901 Feb 1996 DAY 96/02/01 96/02/02 96/02/03 96/02/04 96/02/05 96/02/06 96/02/07 96/02/08
.96/02/09 96/02/10
,96/02/11 96/02/12 96/02/13 96/02/14 96/02/15 96/02/16 AVERAGE DAILY POWER LEVEL 1082 1084 1083 1085 1080 1085 1086 1085 1081 1029 1071 1077 1081 1082 1078 1080 DAY 96/02/17 96/02/18 96/02/19 96/02/20 96/02/21 96/02/22 96/02/23 96/02/24 96/02/25 96/02/26 96/02/27 96/02/28 96/02/29 AVERAGE DAILY POWER LEVEL 1077 1085 1079 1102 1073 1070 1080 1084 1081 1079 1081 1085 1081
DOCKET NO:
UNIT NAME'OMELETED BY'ELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit 2 M.E. Russo 616-465-5901 March 4, 1996 Page 1 of 1
MONTHLY OPERATING ACTIVITIES FEBRUARY 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 106%
RTP.
Reactor power was decreased to 95%
RTP February 10, 1996 at 0500 to return Moisture Seperator Reheaters to service.
Reactor power was stabilized at 100% February 11, 1996 at 0246.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of February was 776520 MWH.
DETAILS 02-10-96 02-11-96 0410 0500 0231 Commenced Reactor power reduction to 95%
RTP to place Moisture Seperator Reheaters in service.
Reactor power stabilized at 95% RTP.
Commenced placing Moisture Seperator Reheaters in service.
0246 Moisture Seperator Reheaters in service.
Reactor power stabilized at 100% RTP.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH:
FEBRUARY 1996 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
D.C.
COOK UNIT 2; March 4, 1996 M.E. Russo 616-465-5901 Page 1
OF. 1 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE None There were no unit shutdowns o~
significant power reductions fro~i 100'b RTP this month.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and Iicense Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:
Same Source
~
~
~