ML17333A229

From kanterella
Jump to navigation Jump to search
Amends 204 & 189 to Licenses DPR-58 & DPR-74,respectively, Changing Surveillance Frequency for Manual Actuation Function for Msli from Monthly to Quarterly
ML17333A229
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/13/1995
From: John Hickman
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17333A230 List:
References
NUDOCS 9512190273
Download: ML17333A229 (12)


Text

~p,'5 REPS P

~4 0

~y

~c O

I Op Cp e~Q

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-315 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

206 License No. DPR-58 l.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

D.

E.

The application for amendment by Indiana Michigan Power Company (the licensee) dated May 25,

1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

95f2i90273 95i2i3 PDR ADQCK 050003i5 1

P PDR

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-58 is hereby amended to read as follows:

Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 204, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of issuance, with full implementation within 45 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

December 13, 1995 John B. Hickman, Project Manager Project Directorate III-I Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

0

ATTACHMENT TO LICENSE AMENDMENT NO.

204 TO FACILITY OPERATING LICENSE NO.

DPR-58 DOCKET NO. 50-315 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.

The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

.REMOVE 3/4 3-33b 3/4 3-34 INS RT 3/4 3-33b 3/4 3-34

3/4 LIMH'INGCONDITIONS FOR OPERATION ANDSURVEILLANCEREQUIREMENTS 3/4B INSTRUM.'NTATION TABLE 4.3-2 Continu ENGINEERED SAFETY FEATURE ACTUATIONSYSTEM INSTRUMENTATION SURVEILLANCERE UIREMENTS FUNCTIONALUNIT 9.

Manual TRIP ACTUATING MODES IN CHANNEL DEVICE WHICH CHANNEL CHAI&fEL FUNCTIONAL OPERATIONAL SURVEILLANCE CHECK CALIBRATION TEST a.

Safety Injection (ECCS)

Feedwater Isolation Reactor Trip (SI)

Containment Isolation-Phase A"

Containment Purge and Exhaust Isolation Auxiliary Feedwater Pumps Essential Servic'e Water System N.A.

N.A.

R I, 2, 3, 4 b.

Conuinment Spray Containment Isolation-Phase B

Containment Purge and Exhaust Isolation Conuinment Air Recirculation Fan NA.

N.A.

N.A.

R 1.2,3,4 c.

Containment Isolation-Phase "A Containment Purge and Exhaust Isolation d.

Steam Line Isolation N.A.

NA.

N.A.

N.A.

NA.

R R

1,2,3,4 I, 2, 3 COOK.iiLCLEAR PLA:iT-UiitTI' Page 3/4 3-33b ALIEN)i~IENT~,

204

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 4. -2 Continu TABLE NOTATION (l)

Deleted (2)

Each train or logic channel shall be tested at least every other 31 days.

(3)

The CHANNELFUNCTIONALTEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the ttansminer.

COOK NUCLEAR PLANT-UttTI Page 3/4 3-34 A~Izma(z>W ae, 204

pe 8500 (4

~o 0

C O

IV)

+0

~O

+a**+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

189 License No.

DPR-74 l.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Indiana Michigan Power Company (the licensee) dated May 25,

1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

DPR-74 is hereby amended to read as follows:

Technical S ecifications The Technical Specifications contained in Appendices A and B,

as revised through Amendment No.

189

, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications..

3.

This license amendment is effective as of the date of issuance, with full implementation within 45 days.

FOR THE NUCLEAR REGULATORY COHHISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

December 13, 1995 John B. Hickman, Project Hanager Project Directorate III-I Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

TTACHMENT TO LICENSE AMENDMENT NO.

189 FACILITY OPERATING LICENSE NO.

DPR-74 DOCKET NO. 50-316 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.

The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

REMOVE 3/4 3-32 3/4 3-32a 3/4 3-33 NSER 3/4 3-32 3/4 3-33

~

~

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMIPPZS 3/4B INSTRUMENTATION TABLE4.3-2 Continued ENGINEERED SAFETY FEATURE ACTUATIONSYSTEM INSTRUMENTATION SURVEILLANCERE UIREMENTS FUNCTIONALUNIT 7.

TURBINE DRIVEN AUXILIARYFEEDWATER PUMP TRIP

~

ACTUATING MODES IN CHANNEL DEVICE WHICH CHANNEL CHANNEL FUNCTIONAL OPERATIONAL SURVHLLANCE CHECK CALIRRATICH TEEI'EST

~RE UIRED a.

Steam Generator Water Level Low-Low b.

Reactor Coolant Pump Bus Undetvoltage S.

LOSS OF POWER a.

4 kv Bus Loss of Voltage b.

4 kv Bus Degraded Voltage 9.

MANUAL a.

Safety Injection (ECCS)

Feedwater Isolation Reactor Trip (SQ Contahuaent Isohdon-Phasc "A Containment Purge.aad Exhaust Isolaaon Auxiliary Feedwater Pumps Essential Service Water System b.

Containment Spray Containment Isohtion-Phase B

Containment Purge and Exhaust Isolation Containmeat Air Recitcuhdon Fan c.

Containment Isohaon-Phase A

Containment Purge and Exhaust Isoladon d.

Steam Linc Isolation N.A.

NA.

R R

N.A.

NA.

N.A.

N.A.

NA.

N.A.

N.A.

N.A.

R R

1.2,3

1. 2. 3 1,2,3,4 1.2,3,4 1.2,3,4
l. 2, 3. 4 1.2.3.4
l. 2, 3 COOK NUCLEAR PLANT-UttT2 Page 3/4 3-32 A~IEiA)MENT8", R, W 1, 44~s 0-:.~, 189

3/4 LIMITINGCONDITIONS FOR OPERATION ANDSURVEILLANCEREQUIREMENTS 3/4.3 INSTRUMENTATION TABLE4.3-2 Continued TABLENOTATION (1)

Deleted (2)

Each train or logic channel shall be tested at last every other 31 days.

(3)

The CHANNELFUNCTIONALTEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.

COOK NUCLEAR PLURI'-UNIT2 Page 3/4 3-33 ALIEN)1K'P,4W, 289