Monthly Operating Rept for Oct 1995 for DC Cook Nuclear Plant Unit 2
ML17332B010
Person / Time
Site: Cook 
Issue date: 10/31/1995
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511150074
Download: ML17332B010 (6)


Text

~

4

~

4 PRZOR1TY 1

(ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION~NBR:9511150074 DOC.DATE: 95/10/31 NOTARIZED: NO DOCKET FACIL:50-316'Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele BLIND,A.A.

Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1995 for DC Cook Nuclear Plant Unit 2.W/951106 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I ENCLf SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL LITCO BRYCE E J H

NRC PDR COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1

1 HICKMAN,J 1

1 NOAC 1

1 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

November 6,

1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of October 1995 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett D.G. Turner Visitor Center Manager M.E. Russo 9511150074 951031 PDR ADQCK 05000316 R

PDR

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 06/Nov/95 COMPLETED BY Janisse JD TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period Oct 1995 notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11 'ours in Reporting Period 744.0 7296.0 156312.0 12.

No. of Hrs

~ Reactor Was Critical 744.0 6843.8 106860.3

13. Reactor Reserve Shutdown Hours 0.0 0 '

0.0

14. Hours Generator on Line 744.0 6806.6 103341.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16 'ross Therm.

Energy Gen.

(MWH) 2530875 22598934 316697115 17.

Gross Elect.

Energy Gen.

(MWH) 818020 7278780 102585770

18. Net Elect.

Energy Gen.

(MWH) 791419 7034015 98791450

19. Unit Service Factor 100.0 93.3 67.1
20. Unit Availability Factor 100.0 93.3 67.1
21. Unit Capacity Factor (MDC Net) 100.4 91.0 60.4
22. Unit Capacity Factor (DER Net) 97.6 88.4 58.9
23. Unit Forced Outage Rate 0.0 6.7 15.3 24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

Refuelin outa e to be in March 23 1996 for an estimated duration of 50 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO.

50-316 UNIT TWO DATE 06/Nov/95 COMPLETED BY Janisse JD TELEPHONE 616-465-5901 Oct 1995 DAY 95/10/01 95/10/02 95/10/03 95/10/04 95/10/05 95/10/06 95/10/07 95/10/08 95/10/09 95/10/10 95/10/11 95/10/12 95/10/13 95/10/14 95/10/15 95/10/16 AVERAGE DAILY POWER LEVEL 1057 1060 1057 1063 1068 1065 1064.

1066 1068 1061 1063 1062 1061 1060 1064 1066 DAY 95/10/17 95/10/18 95/10/19 95/10/20 95/10/21 95/10/22 95/10/23 95/10/24 95/10/25 95/10/26 95/10/27 95/10/28 95/10/29 95/10/30 95/10/31 AVERAGE DAILY POWER LEVEL 1063 1004 1065 1081 1051 1071 1067 1071 1070 1070 1072 1071 1070 1073 1073

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.C.

Cook Unit 2 M.E. Russo 616-465-5901 November 6,

1995 Page 1 of 1

The unit entered this reporting period in Mode 1 at 100'.

RTP:

Reactor Power was decreased to 94:

RTP October 18, 1995 at 0008 to meet T.S. 3.5.2 requirements to perform planned Safety Injection System maintenance.

Power ascension to 100.

RTP commenced October 18, 1995 at 2200 and was attained October 19, 1995 at 0320.

The unit exited this reporting period in Mode 1 at 100%

RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month 'of May was 818020 MWH.

10-18-95 0008 Commenced Reactor power decrease to 94.

RTP to meet T.S. 3.5.2 requirements for removal of 4 loop injection from the SI system.

0140 Reactor power stabilized at 94'.

RTP.

10-19-95 2200 0320 Commenced Reactor power ascension to 100:

RTP.

Reactor power stabilized at 100'.

RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1995 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

D.C.

COOK UNIT 2 November 6, 1995 M.E. Russo 616-465-5901 Page 1 OF 1 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REPORT NO.

CODE CODE TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100% RTP this month.

F S

Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain)

Exhibit G -"Instructions for preparation of data entry sheets for Licensee Event Report (LER) File.

(NUREG 0161) 5 Exhibit I:

Same Source