ML17332A880

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1995 for DC Cook Nuclear Plant Unit 2
ML17332A880
Person / Time
Site: Cook 
Issue date: 07/31/1995
From: Blind A, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508150126
Download: ML17332A880 (8)


Text

+PRIORITY 1 (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

F ACCESSION" NBR: 9508150126 DOC. DATE: 95/07/31 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 p

AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION.

SUBJECT:

Monthly operating rept for Jul 1995 for DC Cook Nuclear Plant Unit 2.W/950808 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCL L SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD 4

INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J C~R 1

'CB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

0 N

NOTE,TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

indiana Michigan~

Power Company Cook Nuclear Plant One Cook Place Bridgman, MI 49106 616 465 5901 I

August 8,

1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1995 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella M.E. Russo 9508150126 9507Z1 PDR ADOCK 05000316' R

PDR

N.R.C.

OPERATING DATA REPORT DOCKET NO ~

50-316 DATE 02/Aug/95 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 2

2. Reporting Period July 1995 notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11. Hours in Reporting Period 12.

No. of Hrs

~ Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH)

17. Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 744.0 5088.0 744.0 4952.7 0.0 0.0 744.0 4948.2 0.0 0.0 2523793 16453665 786380 5321730 759411 5143799 100.0 97.3 100.0 97.3 96.3 95.4 93.6 92.7 0.0 2.7 Months (Type, Date,and Cumm.

154104.0 104969.2 0.0 101483.3 0.0 310551847 100628720 96901234 66.9 66.9 60.1 58.6 15.3 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO.

DATE 02/Aug/95 COMPLETED BY DG Turner TELEPHONE 616-465-5901 DAY MONTH AVERAGE DAILY POWER LEVEL July 1995 DAY AVERAGE DAILY POWER LEVEL 95/07/01 95/07/02 95/07/03 95/07/04 95/07/05 95/07/06 95/07/07 95/07/08 95/07/09 95/07/10 95/07/11 95/07/12 95/07/13 95/07/14 95/07/15 95/07/16 1053 1044 1040 1037 1038 1041

~

1039 1037 1040 1038 1040 1041 1027 1018 1011 1013 95/07/17 95/07/18 95/07/19 95/07/20 95/07/21 95/07/22 95/07/23 95/07/24 95/07/25 95/07/26 95/07/27 95/07/28 95/07/29 95/07/30 95/07/31 1010 1009 999 940 950 1011 1028 1021 1016 1017 1021 1012 1014 1012 1025

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE'ATE'AGE'0-316'.C.

Cook Unit 2 G.F.

Bussone 616-465-5901 August 8, 1995 Page 1 of 1

MONTHLY OPERATING ACTIVITIES JULY 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%

RTP.

The unit exited this reporting period in Mode 1 at 100%

RTP.

There were no challenges to the pressurizer safety valves or power

,operated relief valves.

Gross electrical generation for the month of July was 786380 MWH.

DETAILS H

No details to report.

~

~

v

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JULY 1995 UNIT NAME:

DATE:

COMPLETED. BY:

TELEPHONE:

PAGE:

l.,

D.C.

COOK UNIT 2 August 8, 1995 G.F.

Bussone 616-465'-5901 Page 1 OF 1

DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT REPORT NO.

SYSTEM CODE COMPONENT CAUSE AND CORRECTIVE ACTION CODE TO PREVENT RECURRENCE There were no unit shutdowns or significant power reductions fro~

100%

RTP this month.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain)

Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:

Same-Source

I I

C lb