PRIORITY.1 (ACCELERATED RZDS PROCESSZNG)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSIOS NBR: 9507140138 DOC. DATE: 95/06/30 NOTARIZED: NO DOCKET I FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 P
AUTH.NAME AUTHOR AFFILIATION TURNER,J.
BUSSONE,G.F.
BLIND,A.A.
RECIP.NAME RECIPIENT AFFILIATION I
SUBJECT:
Monthly operating repts for June 1995 for Donald C Cook Nuclear Unit 2.W/950706 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
( ENCL
(
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT ID CODE/NAME
'PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J C
NRR/DOPS/OECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 N
NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5DS (415-2083)
TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
Power Company Cook Nuclear Plant One Cook Place
'ridgman, Ml 49106 616 465 5901 July 6, 1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1995 is submitted.
Respectfully,
.A. Blind Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella M.E. Russo 9507140138 950630 PDR ADDCK 05000316 R
N.R.C.
RATING DATA REPORT DOCKET NO.
50-316 DATE 03/Jul/95.
COMPLETED BYJanisse/Turner TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period June 1995
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted.
If-Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Therm.
Energy Gen.
(MWH)
Gross Elect.
Energy Gen.
(MWH)
Net Elect.
Energy Gen.
(MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate'hutdowns Scheduled over Next Six'one This Mo.
Yr. to Date 720.0 4344.0 720.0 4208.7 0.0 0.0 720.0 4204.2 0.0 0.0 2447635 13929872 780360 4535350 754340 4384388 100.0 96.8 100.0 96.8 98.8 95.2 96.1 92.6 0.0 3.2 Months (Type, Date,and Cumm.
153360.0 104225.2 0.0 100739;3 0.0 308028053 99842340 96141823 66.7 66.7 60.0 58.4 15.3 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
1'
DOCKET NO.
50-316 UNIT TWO DATE 03/Jul/95 COMPLETED BYJanisse/Turner TELEPHONE 616-465-5901 DAY MONTH AVERAGE DAILY POWER LEVEL June 1995 DAY AVERAGE DAILY POWER LEVEL 95/06/01 95/06/02 95/06/03 95/06/04 95/06/05 95/06/06 95/06/07
'95/06/08 95/06/09 95/06/10 95/06/11 95/06/12 95/06/13 95/06/14 95/06/15 95/06/16 1057 1054 1052 1054 1051 1049 1042 1063 1063 1053 1047 1027 1033 1033
,1028 1029 95/06/17 95/06/18 95/06/19 95/06/20 95/06/21 95/06/22 95/06/23
'5/06/24 95/06/25 95/06/26 95/06/27 95/06/28 95/06/29 95/06/30 1046 1046 1035 1038 1061 1052 1055 1052 1054 1062 1058 1048 1049 1040
DOCKET NO:
UNIT NAME COMPLETED BY:
TELEPHONE:
DATE'AGE:
50-316 D.C.
Cook Unit 2 G.F.
Bussone 616-465-5901 July 6, 1995 Page 1 of 1
MONTHLY OPERATING ACTIVITIES JUNE 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%
RTP.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of June was 780360 MWH.
DETAILS No details to report.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 1995 UNIT NAME:
DATE:
COMPLETED BY TELEPHONE:
PAGE:
D.C.
COOK UNIT July 6,. 1995 G ~ F.
Bussone 616-46P-5901 Page 1 OF 1
DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE There were no unit shutdowns or significant power reductions fro~
100'h RTP this month.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain)
Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:
Same Source