ML17332A793
| ML17332A793 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/31/1995 |
| From: | Blind A, Janisse J INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9506130253 | |
| Download: ML17332A793 (7) | |
Text
RIDRIT'Y Z REGULATO>
- O'WQ&%'1IMHE54CWTffUTION STEM (RIDS)
~
'CCESSION NBR:9506130253 DOC.DATE: 95/05/31 NOTARIZED:
NO DOCKET I
, FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2; Indiana M'5000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele BLIND,A.A.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for May 1995 for DC Cook Nuclear Power Plant.W/950605 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly'Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J CEBB~EN!3 R 01 NRR/DOPS/OECB COPIES LTTR ENCL 1
1 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 YOTE TO ALL"RIDS" RECIPI EBS:.
PLEASE HELP US TO REDUCE O'ASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROONI PI -37 (EXT. 504-2083 ) TO ELIMIYATE YOUR NAME FROTI DISTRIBUTIOYLISTS FOR DOCUMEYTS YOU DO. 4 I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 June 5,
1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of May 1995 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.
S. J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella M.E. Russo 950&f30253 95053i PDR ADOCK 050003i6 R
'DR
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 06/Jun/95 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2 2
~ Reporting Period May 1995
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10 'easons For Restrictions. If Any:
11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect. Energy Gen.
(MWH) 18.
Net Elect Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 744.0 3624.0 744.0 3488.7 0.0 0.0 744.0 3484.2 0.0 0.0 2495599 11482236 810890 3754990 783849 3630048 100.0 96.1 100.0 96.1 99.4 94.5 96.7 91.9 0.0 3.9 Months (Type, Date,and Cumm.
152640.0 103505.2 0.0 100019.3 0.0 305580418 99061980 95387483 66.6 66.6 59.8 58.2 15.4 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE 06/Jun/95 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 May 1995 DAY 95/05/01 95/05/02 95/05/03 95/05/04 95/05/05 95/05/06 95/05/07 95/05/08 95/05/09 95/05/10 95/05/11 95/05/12 95/05/13 95/05/14 95/05/15 95/05/16 AVERAGE DAILY POWER LEVEL 556 1025 1082 1080 1077 1073 1075 1079 1077 1077 1074 1075 1076 1078 1074 1072 DAY 95/05/17 95/05/18 95/05/19 95/05/20 95/05/21 95/05/22 95/05/23 95/05/24 95/05/25 95/05/26 95/05/27 95/05/28 95/05/29 95/05/30 95/05/31 AVERAGE DAILY POWER LEVEL 1072 1070 1062 1068 1063 1065 1061 1064 1066 1069 1068 1074 1075 1067 1065
I
~
~
1 DOCKET NO:
UNIT NAME'OMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit 2 M.E. Russo 616-465-5901 June 5,
1995 Page 1 of 1
MONTHLY OPERATING ACTIVITIES MAY 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 55% RTP.
An Unusual Event was declared on 05-19-95 due to entry into Technical Specification 3.0.3.
A review of past ISI examination techniques resulted in the Emergency Core Cooling System being declared inoperable.
The Unusual Event was exited on 05-19-95 following Nuclear Safety and Licensing evaluation.
During the event, power was reduced to approximately 98%
RTP on both units.
The unit exited this reporting period in Mode 1 at 100%
RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of May was 810890 MWH.
DETAILS 05-01-95 05-02-95 05-19-95 1930 0800 1118 1310 1400 1550 Commenced Reactor power ascension to 100%
RTP following East Main Feed Pump testing.
Reactor power stabilized at 100% RTP.
Unusual Event declared due to Emergency Core Cooling System operability concerns.
Commenced Reactor power reduction.
Exited Unusual Event following Nuclear Safety and Licensing evaluation.
Commenced Reactor power ascension to 100%
RTP.
Reactor power stabilized at 100%
RTP.
~
~
UNIT SHUTDOWNS AND POWER REDUCTiONS REPORT MONTH: MAY 1995 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
D.C.
COOK UNIT June 5,
1995 M.E. Russo 616-465-5901 Page 1 OF 1
2 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM REASON REACTOR REPORT NO.
CODE COMPONENT CAUSE AND CORRECTIVE ACTION CODE TO PREVENT RECURRENCE 243 042895 S
N/A N/A N/A N/A N/A Reactor power was reduced to 55%
RTP on 042895 for planned East Main Feed Pump testing.
Reactor power was returned to 100%
RTP 050295.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain)
Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:
Same Source
0
\\
E t
t
~
II y