Text
RIDRIT'Y Z REGUDAT
'QIRHdIIVf%kIE0TIONOETEM (RIDE)
ACC!,"SCI9N NBR: 9505150012 DOC. DATE: 95/04/30 NOTARIZED: NO
. DOCKET N
FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele BLIND,A.A.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Apr 1995 for DC Cook NPP,Unit 2.
W/950504 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J LE CENTER 1
7DO CB COPIES LTTR ENCL 1
1 1
1 1
1 EXTERNAL LITCO BRYCEiJ H
NRC PDR 1
1 1
1 NOAC 1
1 i"POTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE 'O'ASTE! COYTACTTHE DOCL'IIfEYTCOYTROL DESK, ROOiif Pl-37 (EXT. 504-2033 ) TO ELIMIYATEYOUR YAilfEFRO!If DISTRIBl"I'IOY.LISTS FOR DOCU!IifEY. I'S YOU DOi'1"REED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
Indiana Michigan~
Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 May 4, 1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1995 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella M.E. Russo 9505i500i2 950430 PDR AoacK osooosi6 I
R
~
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 02/May/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- l. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period APR 1995
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted.
Xf Any (Net MWe) 10.
Reasons For Restrictions. If Any:
- 11. Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm.
Energy Gen.
(MWH)
- 17. Gross Elect. Energy Gen.
(MWH)
- 18. Net Elect. Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)'2.
Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six This Mo.
Yr.
720.0 720 '0.0 720.0 0.0 2166252 699580 673765 100'.0 100.0 88.3 85.9 0.0 Months (Type, to Date 2880.0 2744.7 0.0 2740.2 0.0 8986637 2944100 2846199 95.1 95.1 93.2 90.7 4.9 Date,and Cumm.
151896.0 102761.2 0.0 99275.3 0.0 303084819 98251090 94603634 66.4 66.4 59.6 58.0 15.5 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast.
INITXAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE 04/May/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 APR 1995 DAY 95/04/01 95/04/02 95/04/03 95/04/04 95/04/05 95/04/06 95/04/07 95/04/08 95/04/09 95/04/10 95/04/11 95/04/12 95/04/13 95/04/14 95/04/15 95/04/16 AVERAGE DAILY POWER LEVEL 1082 1086 1072 1085 1086 1086 1069 1060 1064 1075 1078 1083 1081 1077 1876 1076 DAY 95/04/17 95/04/18 95/04/19 95/04/20 95/04/21 95/04/22 95/04/23 95/04/24 95/04/25 95/04/26 95/04/27 95/04/28 95/04/29 95/04/30 AVERAGE DAILY POWER LEVEL 1078 1077 1024 541 540 545 533 537 742 1079 1072 1016 527 529
DOCKET NO'NIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE 50-316 D.C. Cook Unit 2 M.E. Russo 616-465-5901 May 3, 1995 Page 1 of 1 MONTHLY OPERATING ACTIVITIES APRIL 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%
RTP.
The unit exited this reporting period in Mode 1 at 55% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of April was 699580 MWH.
DETAILS 04-19-95 04-20-95 04-25-95 1900 0235 1030 Commenced Reactor power reduction to 55%
RTP for East Main Feed Pump Condenser cleaning.
Reactor power stabilized at 55% RTP.
Commenced Reactor power ascension to 100%
RTP.
04-28-95 04-29-95 2127 1900 0112 Reactor power stabilized at 100%
RTP.
Commenced Reactor power reduction to 55%
RTP for East Main Feed Pump testing.
Reactor power stabilized at 55% RTP.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: APRIL 1995 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE:
4.
ro D.C.
COOK UNI'V 2 May 3, 1995 M.E. Russo 616-465-5901 Page 1 OF 1 METHOD OF SHUTTING LICENSEE DURATION 'OWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE HOURS REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE 242 041995 S
N/A N/A N/A N/A N/A Reactor power was reduced to 55~
RTP on 041995 for planned East Main Feed Pump Condenser cleaning.
Reactor power was returned to 100%
RTP on 042595.
243 042895 S
N/A
'/A N/A N/A N/A Reactor power was reduced to 55'h RTP on 042895 for planned East Main Feed Pump testing.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other {Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:
Same Source