P R.IC)

R.IMY'CCELERATEDRIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9504240431 DOC.DATE: 95/03/31 NOTARIZED: NO DOCKET g

FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele p

BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

&. Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1995 for DC Cook Nuclear Plant.W/950407 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

0 RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PI PB RGN3 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

~

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J

- ~NTER 01 NRR/DOP NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 Yi D

C U

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIi~IINATEYOUR NAMEFROM DISTRIBUTIONLISTS I'OR DOCUMEiVTSYOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

t 1

I',

~

1 P

I

Indiana Michigan ~

Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 April 7, 199S U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

205S5 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1995 is submitted.

Respectf lly, A.

. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G.

Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger M.E. Russo 9504240431 95033i PDR ADOCK,050003l5 PDR

N. R. C.

OPERATING DATA REPORT DOCKET,NO.

50-315 DATE 04/Apr/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 1

2. Repo'rting Period March 1995
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020

6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes

8. If Changes 'Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9

~

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 2160.0 177480.0 12.

No. of Hrs. Reactor Was Critical 744.0 2160.0 134070.9

13. Reactor Reserve Shutdown Hours 0.0 0.0 463. 0
14. Hours Generator on Line 744. 0 2160. 0 131983. 6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen.

(MWH) 2414412 6939481 389060058

17. Gross Elect. Energy Gen.

(MWH) 789080 2273200 126278640

18. Net Elect. Energy Gen.

(MWH) 762188 2194501 121475816

19. Unit Service Factor 100.0 100.0 75.3
20. Unit Availability Factor 100.0 100.0 75.3
21. Unit Capacity Factor (MDC Net) 102.4 101.6
68. 2
22. Unit Capacity Factor (DER Net) 100.4 99.6 66.5
23. Unit Forced Outage Rate 0.0 0.0 5.7 24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

Refuelin outa e to be in Se tember 15 1995 for an estimated 4

duration of 50 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 04/Apr/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 DAY 95/03/01 95/03/02 95/03/03 95/03/04 95/03/05 95/03/06 95/03/07 95/03/08 95/03/09 95/03/10 95/03/11 95/03/12 95/03/13 95/03/14 95/03/15 95/03/16 MONTH March 1995 AVERAGE DAILY POWER LEVEL 1028 1027 1027 1029 1031 1029 1029 1027 1027 1026 1027 1027 1023 1024 1024 1026 DAY 95/03/17 95/03/18 95/03/19 95/03/20 95/03/21 95/03/22 95/03/23 95/03/24 95/03/25 95/03/26 95/03/27 95/03/28 95/03/29 95/03/30 95/03/31 AVERAGE DAILY POWER LEVEL 1007 1015 1024 1024 1023 1024 1023 1022 1021 1022 1023 1025 1024 1025 1023

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MARCH 1995 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

D.C.

COOK UNIT. 1 April 4, 1'995

~

M.E. Russo 616-465-5901 Page 1 of 1

'URATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100%

RTP this month.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License-Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:

Same Source

4

~

~ (t DOCKET NO:

UNIT NAME:

COMPLETED BY'ELEPHONE:

DATE:

PAGE'0-315 D.C.

Cook Unit 1 M.E. Russo 616-465-5901 April 4, 1995 Page 1 of 1

MONTHLY OPERATING ACTIVITIES MARCH 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.

The unit exited this reporting period in Mode 1 at 100$

RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of March was 789080 MWH.

DETAILS 03-17-95 03-18-95 1857 2135 0005 Commenced Reactor power reduction to 92K RTP for routine Main Turbine and Feed Pump Valve testing.

Reactor power stabilized at 92% RTP.

Commenced Main Turbine and Feed Pump Valve testing.

0100 Main Turbine and Feed Pump Valve testing, completed.

Commenced Reactor power increase to 100% RTP.

0405 Reactor power stabilized at 100%

RTP.

I

~

~