ML17332A614

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1995 for DC Cook Nuclear Plant Unit 1
ML17332A614
Person / Time
Site: Cook 
Issue date: 02/28/1995
From: Blind A, Janisse J, Russo M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9503140240
Download: ML17332A614 (7)


Text

PRIQRITY 1

ACCELERATED RIDS PROCESSING)

ACCESSION NBR:

FACIL:50-315 AUTH.NAME JAi%ISSE,J.D.

RUSSO,M.E.

BLIND,A.A.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS) 9503140240 DOC. DATE: 95/02/28 NOTARIZED: NO DOCKET Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTHOR AFFILIATXON Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1995 for DC Cook Nuclear Plant Unit 1.W/950302 ltr.

DISTRIBUTION CODE:

XE24D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 EXTERNAL LITCO BRYCE i J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J FILE CENTER@. 01 RR/DOPS/OECB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. S04-2083 ) TO ELIXIINATEYOUR NAME PRO.'il DISTRIBUTIONLISTS I:OR DOCLMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPXES REQUIRED:

LTTR 10 ENCL 10

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 March 2, 1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1995 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G.

Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger M.E. Russo 9503i40240 950228 PDR 'DOCK, 05000315 R

PDR

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 01/Mar/95 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 OPERATING STATUS Unit Name D.

C.

Cook Unit 1 Reporting Period FEB 1995 Licensed Thermal Power (MWt) 3250 Name Plate Rating (Gross MWe) 1152 Design Electrical Rating (Net MWe) 1020 Maximum Dependable Capacity (GROSS MWe) 1056 Maximum Dependable Capacity (Net MWe) 1000 1.

2

~

3.

4

~

5.

6.

7.

,8.

notes If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

ll. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 672.0 1416.0.

672.0 1416 '

0.0 0.0 672.0 1416.0 0.0 0.0 2180264 4525069 715290 1484120 690658 1432313 100.0 100.0 100.0 100.0 102.8 101 '

100.8 99.2 0.0 0.0 Months (Type, Date,and Cumm.

176736.0 133326.9 463.0 131239.6 321.0 386645646 125489560 120713628 75.2 75.2 68.1 66.3

5.7 Duration)

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'1

AVERAGE DAILY POWER LEVEL (HWe-Net)

HONTH DOCKET NO.

50-315 UNIT ONE DATE

'l/Hal /95 COHPLETED BY JD JANISSE TELEPHONE 616-465-5901 FEB 1995 DAY 95/02/01 95/02/02 95/02/03 95/02/04 95/02/05 95/02/06 95/02/07 95/02/08 95/02/09 95/02/10 95/02/11 95/02/12 95/02/13 95/02/14 95/02/15 95/02/16 AVERAGE DAILY POWER LEVEL 1029 1028 1031 1031 1030 1030 1031 1029 1029 1015 1019 1028 1028 1030 1031 1025 DAY 95/02/17 95/02/18 95/02/19 95/02/20 95/02/21 95/02/22 95/02/23 95/02/24 95/02/25 95/02/26 95/02/27 95/02/28 AVERAGE DAILY POWER LEVEL 1031 1031 1029 1026 1035 1033 1025 1026 1024 1026 1025 1025

DOCKET UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE PAGE 50-315 D.C.'Cook Unit 1

M.E. Russo 616-465-5901 March 2, 1995 Page 1 of 1

MONTHLY OPERATING ACTIVITIES FEBRUARY 1995 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of February was 715290 MWH.

DETAILS 02-10-95 02-10-95 02-10-95 02-11-95 1915 2218 2245 0050 Commenced Reactor power reduction to 92%

RTP for Main Turbine and Feed Pump Valve testing.

Reactor power stabilized at 92% RTP.

Commenced Main Turbine and Feed Pump Valve testing.

Main Turbine and Feed Pump Valve testing completed.

Commenced Reactor power increase to 99.9%

RTP.

02-11-95 0415 Reactor power stabilized at 99.9%

RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH:

FEBRUARY 1995 UNIT NAME:

DATE COMPLETED BY:

TELEPHONE:

PAGE:

D.C.

COOK UNIT March 2, 1995 M.E. Russo 616-465-5901 Page 1 of 1 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100%

RTP this month.

1 F:

S:

Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:

Same Source