Notice of Violation from Insp on 940601-08.Violation Noted: Inspector Observed Grinding,Welding & Cutting Activities in Turbine Building That Did Not Have Combustibles Removed or Covered within 35 Feet of Activities
ML17331B435
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/15/1994
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17331B434 List:
References
50-315-94-12, 50-316-94-12, NUDOCS 9406220328
Download: ML17331B435 (1)


Text

NOTICE OF VIOLATION Indiana Hichigan Power Company Donald C.

Cook Nuclear Plant, Units 1

and 2

Docket Nos.

50-315, 50-316 License Nos.

DPR-58, DPR-74 During an NRC inspection conducted on June 1-8,

1994, a violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C, the violation is listed below:

Technical Specification 6.8. l.a requires adherence to fire protection program implementing procedures.

D.

C.

Cook Preventive Haintenance Instruction, PHI-2270, "Fire Protection,"

Revision 22, requires that a work area be cleared of all combustible materials below or within 35 feet of work or a non-flammable material be provided to cover or shield adjacent or lower equipment.

Contrary to the above:

On June 3, 1994, the inspector observed grinding, welding, and cutting activities in the turbine building that did not have combustibles removed or covered within 35 feet of these activities (50-315/316/94012-

~

~

01(DRS) ).

This is a Severity Level IV Violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Indiana Hichigan Power Company is hereby required to submit a written statement or eXplanation to the U.S.

Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C.

20555 with a copy to the Regional Administrator, Region III, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for the violation cited:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results

achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued to show cause why the license should not be

modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Lisle, Illinois, this 15th day of June 1994 9406220328 9406 1.5 PDR ADOCK 05000325 9