Forwards Insp Rept 50-315/94-04 on 940216-0322 & Notice of Violation.Nrc Concerned W/Control Room Operators Inadequate Control of Draining of RCS on 940216-18,when RCS Level Was off-scale for Five Hours
ML17331B341
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/01/1994
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17331B342 List:
References
NUDOCS 9404140024
Download: ML17331B341 (7)


See also: IR 05000315/1994004

Text

Docket No. 50-315

Indiana Hichigan. Power

Company

ATTN:

Hr.

E.

E. Fitzpatrick

Senior Vice President

Nuclear Generation

1 Riverside

Plaza

Columbus,

OH

43216'ear

Hr. Fitzpatrick:

This refers to the special

inspection

conducted

by Hessrs.

R.

Leemon

and

J.

Isom of this office from February

16 .through Harch 22,

1994.

The

inspection

focused

on the level perturbations

during the draining of the

Unit

1 reactor coolant

system

(RCS)

on February

16 through

18,

1994.

At the

conclusion of the inspection,

the findings were discussed

with those

members

of your staff identified in the enclosed report.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

and interviews with

personnel.

The purpose of the inspection

was to determine

whether activities

authorized

by the licensee

were conducted

safely

and in accordance

with NRC

requirements.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violations were in the areas

of procedures,

corrective actions to

a previous event,

equipment status,

and work scheduling

and planning.

We are concerned

with the control

room operators'nadequate

control of the

draining of the

RCS

on February

16 through

18,

1994,

when

RCS level

was off-

scale for five hours.

The perceived

schedule

pressure

applied to the

operators,

along with an inadequate. procedure,

contributed to this event.

This report also identifies

an Unresolved

Item that pertained to the training

of operators for infrequently performed plant evolutions.

As agreed

upon with

your staff,

a written response

to this Unresolved

Item will be provided

by

August

1,

1994.

A written response

is required

and you should follow the instruction specified

in the enclosed

Notice.

In your response,

you should document the specific

actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this Notice, including your proposed

corrective actions

and the results of future inspections,

the

NRC will

determine

whether further

NRC enforcement

action is necessary

to ensure

compliance with NRC regulatory requirements.

)~ee l7

9404140024

940401

PDR

ADOCK 05000315

8

PDR

,1

Indiana Michigan Power

AFR

I 1994

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter, the enclosures,

and your response

to this letter will be placed

in the

NRC Public Document

Room.

The responses

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork Reduction Acto of 1980,

PL 96-511.

Me will gladly discuss

any questions

you have concerning this inspection.,

Sincerely,

Q~~M

edward

G.

Greenman,

Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-315/94004(DRP)

cc w/enclosures:

A. A. Blind, Plant Manager

OC/LFDCB

Resident

Inspector,

RIII

James

R. Padgett,

Michigan

Public Service

Commission

Michigan Department of

Public Health

D.

C.

Cook,

LPM,

NRR

bcc:

PUBLIC (IE01) ~

RIII

R II

irok

A)~x $ (.c

Greenman

~y,R RECT Ip0

1'a*+>>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGiON III

801 WARRENVILLEROAD

LISLE, ILLINOIS60532-4351

A;-2

1 I"34

Docket No. 50-315

Indiana Michigan Power

Company

ATTN:

Mr.

ED

E. Fitzpatrick

Senior Vice President

Nuclear Generation

1 Riverside

Plaza

Columbus,

OH

43216

Dear Mr. Fitzpatrick:

This refers to the special

inspection

conducted

by Messrs.

R.

Leemon

and

J.

Isom of this.,ofFice from February

16 through March 22,

1994.

The

inspection

focused

on the level perturbations

during the draining of the

Unit

1 reactor coolant

system

(RCS)

on February

16 through

18,

1994.

At the

conclusion of the inspection,

the findings were discussed

with those

members

of your staff identified in the enclosed report.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection,

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

and interviews with

personnel.

The purpose of the inspection

was to determine

whether activities

authorized

by the licensee

were conducted safely

and in accordance

with NRC

requirements.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violations were in the areas

of procedures,

corrective actions to

a previous event,

equipment status,

and work scheduling

and planning.

We are concerned

with the control

room operators'nadequate

control of the

draining of the

RCS

on February

16 through

18,

1994,

when

RCS level

was off-

scale for five hours.

The perceived

schedule

pressure

applied to the

operators,

along with an inadequate

procedure,

contributed to this event.

This report also identifies

an Unresolved

Item that pertained to the training

'f operators

for infrequently performed plant evolutions.

As agreed

upon with

your staff,

a written response

to this Unresolved

Item will be provided

by

August 1,

1994.

A written response

is required

and you should follow the instruction specified

in the enclosed

Notice.

In your response,

you should document

the specific

actions

taken

and

any additional actions

you plan to prevent recurrence.

After reviewing your response

to this Notice, including your proposed

corrective actions

and the results of future inspections,

the

NRC will

determine whether further

NRC enforcement

action is necessary

to ensure

compliance with NRC regulatory requirements.

Indiana Hichigan

Power

2

'n

accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter,

the enclosures,

and your response

to this letter will be placed

in the

NRC Public Document

Room.

The responses

directed

by this letter

and the accompanying

Notice are not

subject to the:clearance

procedures

of the Office of Hanagement

and Budget

as

required

by the Paperwork Reduction Acto of 1980,

PL 96-511.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-315/94004(DRP)

cc w/enclosures:

A. A. Blind, Plant Hanager

OC/LFDCB

Resident

Inspector,

RIII

James

R. Padgett,

Hichigan

Public Service

Commission

Hichigan Department of

Public Health

D.

C.

Cook,

LPH,

NRR

'Ac.~

Edward

G.

Greenman,

Director

Division of Reactor Projects