ML17331A658

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required
ML17331A658
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/09/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 8103020109
Download: ML17331A658 (4)


Text

ai gas Ropy~

)f

~4 O

Cy n

C O

'+0 qO

++*++

t UNITED STATES NUCLEAR REGULATORY COIVIMISSION REGION III 799 ROOSEVELT ROAD GLEN ELLYN,ILLINOIS60137 February 9, 1981 Gentlemen:

The enclosed IE Circular No. 81-02 is forwarded for your information.

A copy of this circular is also being mailed directly to each licensed reactor operator and senior reactor operator.

No written response is required.

If there are any questions related to your understanding of the recommended

actions, please contact this office.

Sincerely, AA James G. Keppler Director

Enclosure:

IE Circular No. 81-02

~1 p 8 p pp ( op'

1I I

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman

, Engineering 2 Broadway New York, NY 10004 cc w/ ncl:

D.

. Shaller, Plant Manager ntral Files AD/Licensing AD/Operating Reactors AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission

K ll E

ah

~'~ ~*

',q'a 10 S

gJ