05000315/LER-1980-028-03, /03L-0:on 801227,two Lower Ice Condenser Inlet Door Openings Exceeded Torque Spec.Caused by Slipping Insulation Around Doors Due to Adhesive Bond Failure.Metal Screws Added to All Lower Door Insulation

From kanterella
(Redirected from ML17331A595)
Jump to navigation Jump to search
/03L-0:on 801227,two Lower Ice Condenser Inlet Door Openings Exceeded Torque Spec.Caused by Slipping Insulation Around Doors Due to Adhesive Bond Failure.Metal Screws Added to All Lower Door Insulation
ML17331A595
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/23/1981
From: Delong S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17331A594 List:
References
LER-80-028-03L-01, LER-80-28-3L-1, NUDOCS 8101290521
Download: ML17331A595 (4)


LER-1980-028, /03L-0:on 801227,two Lower Ice Condenser Inlet Door Openings Exceeded Torque Spec.Caused by Slipping Insulation Around Doors Due to Adhesive Bond Failure.Metal Screws Added to All Lower Door Insulation
Event date:
Report date:
3151980028R03 - NRC Website

text

I7.77 )

0 2

LICENSEE EVENT REPORT TYPE ALLREQUIRED INFORMATION)

Q~ >>

Q~Q 26 LICENSE TYPE 30 5Z CAT 58 6

~

I QB 74 75 REPORT OA i K 80

'ONTROL BLOCK:

QI

{PLEASE PRINT OR I

6 t1 I DC C1Q2 LICENSEE CPOE 14 15 LICENSE NUMBER 25 sOURCE ~LQ6 0

5 0

0 0

3 1

5 Q 60 61 OOCKETI'IUMBER 68 69 EVFNT DATE EVENT DESCRIPTION ANO PROBABLE CONSEQUENCES Qlo DURING A PERFORMANCE OF THE SURVEILLANCE T ST F

T OPENING TORQUE TWO DOORS EXCEEOEO THE TOP, UE SPECIFIED IN T.S. 4.

~04 CONDITION WAS NOf'ICONSERVATIVE WITH RESPECT TO T.S. 3. 6. 5. 3.

.'96]

I~07 1~08

't 8

9 80 SYSTEM

CAUSE

CAUSE CO I'i'IP.

VALV6 COOK COOK SUBCOOE COMPO tl 6 NT COO E SUBCOOE SUBCOOE

.~SB Qii

~BQI2

~AQu Z

Z Z

Z Z

Z Qi

~ZQ>>

~Z Qie t

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURR'ENCE REPORT REVISION "

LER,RO EVENT YEAR REPORT NO.

CODE TYPE NO.

Qi>>iio>>

~BO

~

~o2 8

~~

~03

~L

~

~0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTOOWN ATTACHMENT NPROP PRIME CO',IP.

COMPONENT TAKEN ACTION ON PLANT IVIETHOO*

HOURS Q22 SUBMITTED FORM SUB.

SUPPLIKR MANUFACTURER

~FQIB ~GB

~Q20 ~6 LyJQ

~Q24

~Q2S W

1 2

0 Q26 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION ANO CORRECTIVE ACTIONS Q27 o

THE INSULATION AROUND THE I

0 I.

I~

D O I' THE RUBBING BETWEEN THE DOORS AND THE INSULATION AT THIS INTERFACE I'I EXCESSIVE TORQUE.

BY DESIGN THE INSULATIOtl IS AND IT WAS THIS BONO THAT FAI

'AN 1

FC 01-1 19 4

TO ADD SHEET METAL SCREWS TO THE INSULATION ON ALL THE LO'WER DO RS.

THIS WAS 80 80 LOCATION OF REI. ASE Q ACTIVITY ONTKNT RELEASEO OF RELEASE

'MOUNTOF ACTIVITYQS

~ls Z (y ~ZQ24 NA 8

9 10 11 44 PERSONiNEL EXPOSURES NUtNBER TYPE OESCRIPTION Q39

~oo o

Qii z

Q>>

8 9

11 12 13 PERSOi'PANEL INJURIES NUtiIBER

DESCRIPTION

~ol 0 0

Qa NA NA 80 80 80 8

9 11 12 LOSS OF OR OAMAPE TO FACILITYQ43 TYPE OESCRIPTION z

Q42 9

10 PUBLICITY ISSUEO OESCRIPTION ~S

~NQ44 9

10 80 NRC USE ONLY N

80 o

0 p

l 8

68 59 NA41E OF PREP " RER STEVE OELONG PHONEI 616 465-5901 6 1 0 y 8 8 Pgg(,

t 8

9 FACILITY

~30 METHOD OF STATUS SI POWER OTHER STATUS ~

DISCOVERY DISCOVERY OESCRIPTION Q32 S

B Q28 ~00 0 Q>>

NA

~BQii SURVEILLANCE TEST 8

9 10 12 13 44 45 46 C

LER 80-028/03L-0 CAUSE DESCRIPTION AND CORRECTIYE ACTIONS 27 I

AND ALL DOORS llERE TESTED AND FOUND TO hfEET TECHNICAL SPECIFICATIONS.

A JOB ORDER HAS BEEN lr(RITTEN TO CHECK THE UNIT 2 LOWER ICE CONDENSER DOOR INSULATION DURING THE NEXT REFUELING OUTAGE.