ML17331A527

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-035/03L-0 & 80-036/03L-0
Date released: 05/31/2018 Download: ML17331A527


LER 80-036/03L-0:on 801202,discovered That Monthly Functional Test of Source Range Nuclear Instrumentation Not Performed.Caused by Personnel Error.Test Has Been Added to Surveillance Schedule
ML17331A529
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1980
From: Rischling J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17331A529 (4)
LER 80-035/03L-0:on 801206,rod Position Identification for Control Rod N-9 Did Not Respond Properly.Caused by Connector on Top of Rod Position Detector Assembly That Appeared to Have Been Stepped On.Cable Replaced
ML17331A528
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1980
From: Rischling J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17331A528 (1)
Forwards LERs 80-035/03L-0 & 80-036/03L-0
ML17331A525
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/02/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17331A525 (2)