05000315/LER-1980-020-03, /03L-0:on 800831,during Normal Operation,Unit Trip & Train a Safety Injection & Steam Line Isolation Occurred. Caused by Shorted Diode in Crid 4 Inverter.All Diodes & Oscillator Boards Replaced,Tested & Returned to Svc

From kanterella
(Redirected from ML17331A460)
Jump to navigation Jump to search
/03L-0:on 800831,during Normal Operation,Unit Trip & Train a Safety Injection & Steam Line Isolation Occurred. Caused by Shorted Diode in Crid 4 Inverter.All Diodes & Oscillator Boards Replaced,Tested & Returned to Svc
ML17331A460
Person / Time
Site: Cook 
Issue date: 09/24/1980
From: Delong S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17319A624 List:
References
LER-80-020-03L-01, NUDOCS 8009300517
Download: ML17331A460 (4)


LER-1980-020, /03L-0:on 800831,during Normal Operation,Unit Trip & Train a Safety Injection & Steam Line Isolation Occurred. Caused by Shorted Diode in Crid 4 Inverter.All Diodes & Oscillator Boards Replaced,Tested & Returned to Svc
Event date:
Report date:
3151980020R03 - NRC Website

text

U. S. NUCLEAR REGULATORY COMMISSION NRC FORM 366 (7.7.7)

[OD1]

7 8

CON'T

~O 7

8 LICENSEE EVENT REPORT

,Q 14 15

{PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

CONTROL BLOCK:

M I

D C

0 0

0 Q2 4

1 I

1 1 Q4~09 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 9

LICENSEE CODE soURGE MLQB 0

5 0

0 0>>

5 Q7 0 8>>

8 0

QB 0

9 2 '9 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABlE CONSEQUENCES +10 DURING NORMAL PLANT OPERATION A REACTOR TRIP, TRAIN A SAFETY INJECTION AND STEAM LINE

~o3 ISOLATION OCCURRED AS A RESULT OF THE LOSS OF A 120 VOLT A.C. VITAL BUS.

THIS CONDI-

~o4 TION WAS NONCONSERVATIVE WITH RESPECT TO TECHNICAL SPECIFICATION 3.8.2,1.

SIMILAR

~o 6

OCCURRENCES INCLUDE, 050-0315/79-22.

~06

~OB 80 7

8 9

~09 7

8 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE 04 E

0'2 LGJ042 G

E N

E R

A 044

~FQ>9

~ZS 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER1RP EVENT YEAR REPORT NO.

CODE TYPE NO.

Q2 922O92 [Jg 0 Q

~0..2 0

QZ

~03 QL [J

QO 21 22 23 24 26 27 28 29 30 31 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDP PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOLIRS +22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER

~A019 ~Z019

~A029

~0024 0

0 Z 3

~Y Q22

~Y024

~N029 5

2 5

0 Q29 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o

THE CAUSE OF THE FAILURE WAS DUE TO A SHORTED DIODE IN THE CRID IV INVERTER WHICH IN 1

TURN CAUSED THE AC +

DC INCOMING LINE FUSES TO THAT INVERTER TO BLOW.

ALL SCR' 2

DIODES AND OSCILLATOR CIRCUIT BOARDS WERE REPLACED AS A PRECAUTIONARY MEASURE AND THE

~l3 INVERTER WAS TESTED AND RETURNED TO SERVICE.

THE CAUSE OF THE DIODE FAILURE, WESTIN HOUSE k'70D6R-1 HAS BEEN ATTRIBUTED TO NORI1AL END OF LIFE.

THE ACTION REQUIREMENTS 9

E Q9 ~09 5

Q9 NA 7

8 9

10 12 13 44 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITY 6

~Z Q3

~ZQ34 NA 7

8 9

10 11 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39

~00 0

0>>~ZQ>>

NA 7

8 9

11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTION~4" 0

0 049 NA

~AQ31 45 7

8 9

FACILITY

~3P METHOD OF STATUS 55 POWER OTHER STATUS QBO DISCOVERY DISCOVERY DESCRIPTION Q32 OPERATIONAL EVENT LOCATIONOF RELEASE Q 80 80 80 80 NAME OP PREPARER S.

D.

DELONG 7

8 9

11 12 LOSS OF OR DAMAGETO FACILITYQ43 TYPE

DESCRIPTION

9 Z

Q42 NA 7

8 9

10 PUBLICITY ISSUED DESCRIPTION~

~2o

~NQ 8

9 10 8'oa Zoo 80 80 NRC USE ONLY 29a 2

68 69 80 49 PHDNE 465 5901

r

ATTACHMENT bl CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 OF TECHNICAL SPECIFICATION 3.8.2.1 WERE FULFILLED.

a e