OT CE OF V 0 TION Indian Michigan Power Company C; Cook Nuclear Plant Units 1 and 2
H Docket No. 50-315
. Docket No. 50-316 License No. DPR-58 License No. DPR-74 During an NRC inspection conducted on April 21-24 and May 13-20,
- 1992, two violations of NRC requirements were identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1992),
the violations are listed below:'.
Technical Specification 6.8.1.a requires adherence to the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, February 1978.
Section 7.e.2 of Appendix A requires procedures for radiation surveys.
Procedure 12 PMP 6010 RPP.301, "Control of Equipment and Material in a Restricted Area", requires surveys be performed on material leaving the restricted control area for unconditional release.
B.
Contrary to the above, prior to March 30,
- 1992, a
barrel of hazardous waste containing radioactive material was released from the restricted control ar'ea without the required survey being performed.
This is a Severity Level IV violation (Supplement IV).
10 CFR 30.41(a) and (b) (5) require, in part, that no licensee transfer byproduct material except to a person authorized to receive such byproduct material under the terms of a specific or general license issued by the Commission or Agreement State.
Contrary to the above, on July 29 and 30, October 29, and December 18, 1991, the licensee transferred hazardous solvent waste contaminated with byproduct material to four analytical laboratories and an incinerator vendor, persons who were not authorized to possess the byproduct material under the terms of a specific or general license issued by the Commission or Agreement state.
This is a Severity Level IV violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Indiana Michigan Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington D.C.
20555 with a copy to the U.S. Nuclear Regulatory Commission, Region III, 799 Roosevelt 9206090107 920529 PDR ADOCK 05000315 8
- Road, Glen Ellyn, Illinois, 60137, and a copy to the NRC Resident Inspector at the D. C.
Cook Nuclear Reactor Facility within 30 days of the date of the letter transmitting this "Notice of Violation" (Notice).
This reply should be clearly marked as a
"Reply to a Notice of.Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved,
.(3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order or a demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.
Dated at Glen Ellyn, Illinois thisp'Say of May 1992 nth a D. Pederson,
-Chief eactor Programs Branch