ML17329A207

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 910916-19.Violation Noted: Failure to Follow Procedures While Exiting Radiation Control Area
ML17329A207
Person / Time
Site: Cook  
Issue date: 10/08/1991
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17329A206 List:
References
50-315-91-24, 50-316-91-24, NUDOCS 9110170058
Download: ML17329A207 (1)


Text

NOTICE OF VIOLATION American Electric Power Service Corporation Docket No. 50-315 Docket No. 50-316 As a result of the inspection conducted during the period September 16 through September 19,

1991, and in accordance with the "General Policy and Procedures for NRC Enforcement Actions,"

10 CFR 2, Appendix C (1991), the following violation was identified:

Technical Specification 6.8.1.a requires adherence to the applicable procedures recommended in Appendix A of Regulatory'Guide 1.33, February 1978.

Section 7.e.4 and 7 of Appendix A require procedures for contamination control and personnel monitoring.

Procedure 12 PMP 6010 RPP.300, "Contamination Control Program", Section 5.4, requires notification to Radiation Protection in the event of a personnel monitor alarm.

Contrary to the above, on September 18, 1991, during an inspection tour of the Radiation Control Area, an inspector observed three workers alarm personnel contamination monitors without notifying Radiation Protection as required by procedures.

This is a Severity Level IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, Indiana Michigan Power Company is hereby required to submit a written statement or explanation to the U.S.

Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington D.C. 20555 with a copy to the U. S. Nuclear Regulatory Commission, Region III, 799 Roosevelt

Road, Glen Ellyn, Illinois, 60137, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results

achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Glen Ellyn, Illinois thisoM day of ioi194 o er

reger, se Reactor Programs Branch 9llOi70058 9i1008

~"

PDR ADOCK 050003' PDR