ACCELERATED DIKQSUTION DEMONSI'.RPgPON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS).
ACCESSXON NBR:9108210049 DOC.DATE: 91/07/31 NOTARIZED:
NO FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 6
AUTH.NAME AUTHOR AFFILIATION SCHIMMEL,E.C.
BLIND,A.A.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000316
SUBJECT:
Monthly operating rept for Jul 1991 for DC Cook Nuclear Plant.W/910808 ltr.
DISTRIBUTION CODE:
XE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
D RECIPIENT ID CODE/NAME PD3-1 LA COLBURN,T.
INTERNAL: AEOD/DOA NRR/DLPQ/LPEB10 EPACT~
1 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID NODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIEN1S:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14 D
D
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 616 465 5901 August 8, 1991 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1991 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment c:
NRC Region III D.R. Hahn EPRI Nuclear Safety Analysis Center R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.
E.E. Fitzpatrick J.F.
Kurgan J.J.
Markowsky D.A. Timberlake D.W. Paul T.O. Argenta S.H. Steinhart J.L. Leichner J A Isom W.T. Gillett E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E.C.
Schimmel
~Q6 0
9l03210049 9l073 l',
PDR AGOCK 05000316 R
))
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 1-AUG-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name,,
D.
C.
Cook Unit 2
- 2. Reporting Period JULY 1991 notes
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last ReportGive Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
ReaSOnS FOr ReStriCtiOnS. If Any:
See asterics
- below.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Therm.
Energy Gen.
(MWH)
Gross Elect.
Energy Gen.
(MWH)
Net Elect.
Energy Gen.
(MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)
Unit Capacity Facto-(DER Net)
Unit Forced Outage Rate Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 744.0 5087.0 744.0 5034.7 0.0 0.0 744.0 5029.4 0.0 0.0 2435150 16673495 734030 5364550 706427 5178500 100.0 98.9 100.0'8.9 89.6 96 '
86.3 92.5 0.0 1.1 Months (Type, Date, and Cumm.
119039.0 80169.6 0.0 78615.3 0.0 242840548 79151390 76237467 67.4 67.4 61.7 60.0 12.9 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
" Item No.- 5:
Design Electrical Rating (DER) NET MWe has been changed effective July 1, 1991.
This reduction is the result of the steam condenser tube replacements with stainless steel tubes, which cause a higher turbine exhaust pressure.
" Item No. 7:
Maximum dependable capacity (MDC) NET MWe, effective July 1, 1991, will be 1060 during May through October and 1090 during November through April.
These NET ratings and capabilities reflect historical data on generating capability due to changes in lake water temperature.
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-316 UNIT TWO DATE 01-AUG-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 979 935 971 1015 966 664 642 954 963 961 990 994 990 997 980 980 JULY 1991 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 995 975 976 971 964 932 927 934 932 968 961 965 977 993 986
UNIT SHUTDOWNS AND HNER REDUCTIONS REPORT MONXS: July 1991 DOCKET'O'NIT NAME:
DATE:
ODHIPLETED BY:
TELEBiONE'0-316 D.C.
COOK UNIT 2 ~
August 8, 1991 E.C. Schizmnel (616) 465-5901 MEIHOD OF SHVZXING LICENSEE DURATION DOWN EVENT NO DATE TYPE1 HOURS REASON2 REAC!DR3 REZONE% NO SYSTEM:
CCMK5ENT CAUSE AND COEKECZXVE ACTION TO CODE CODE PR1"VENT REKXHRRENCE 216 910706 S
N/A N/A Unit pmer was reduced to 55~a starting 1409 hours0.0163 days <br />0.391 hours <br />0.00233 weeks <br />5.361245e-4 months <br /> on 910706 for cleaning of the main feedpump turbine condenser water boxes. Unit poorer was then increased to 754 and held at 75% for cleaning of the main condenser water boxes. Unit power was restored to 974 at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on 910708.
1 2
F:
Forced Rein:
S:
Scheduled A:
Ecpigment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Re.~iction E:
Operator Training and License lamination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method 1:
Manual 2:
Manual Scram 3:
Autczlatic Scram 4:
Other (Explain) 4 5
Exhibit G Instructions I~itI:
Same Source for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE PAGE:
50-316 D.C.
Cook Unit 2 E.C.
Schimmel (616) 465-5901 August 8, 1991 1 of 1 MONTHLY OPERATING ACTIVITIES Jul 1991 HIGHLIGHTS The unit entered the reporting period at 100% RTP. Minor power adjustments were made beginning 910705 in order to maintain total heat, discharged to Lake Michigan within NPDES permit limits. A unit power reduction commenced beginning 1409 hours0.0163 days <br />0.391 hours <br />0.00233 weeks <br />5.361245e-4 months <br /> on 910706 to allow cleaning of the main feedpump condenser water boxes and main condenser water boxes.
The cleaning was completed and unit power was restored to 974 RTP at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on 910708. Unit power levels ranged between 974 and 994 RTP from 910705 through the end of the reporting period.
The unit exited the reporting period at 98.5%
RTP.
Gross electrical generation for the month of July was 734030 MWH.
DETAILS
-07/06/91 1409 1710 07/07/9 1 0700 1100 07/08/91 0030 0100 Commenced unit power reduction to 55%
RTP for main feedwater pump condenser water box cleaning.
The unit is at 55% RTP.
Commenced unit power increase to 75% RTP.
The unit is at 754 RTP for main condenser water box cleaning.
Commenced unit power increase to 974 RTP.
The unit is at 974 RTP.
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE PAGE 50-316 D.C.
Cook Unit 2 E.C.
Schimmel (616) 465-5901 August 8, 1991 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE Jul 1991 2-M-1 The West Component Cooling Water Heat Exchanger service water inlet shutoff valve, WM0-736, was leaking by.
A new valve was installed,
Z <, L