Concurs W/Request from State of Mi & Util That Exemption Be Granted,Allowing Plant Offsite,Biennial Exercise Currently Scheduled in Nov 1992 to Be Rescheduled in May 1993,per NRC
ML17329A080
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/05/1991
From: Kwiatkowski D
Federal Emergency Management Agency
To: Congel F
Office of Nuclear Reactor Regulation
References
NUDOCS 9107160073
Download: ML17329A080 (5)


Text

ACCELERATED D1%RIBUTION DEMONSTiOiTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET 05000315 05000316

SUBJECT:

Concurs w/request from State of MI & util that exemption b'

granted, allowing plant offsite,biennial exercise currently scheduled in Nov"1992 to be rescheduled in May 1993,per NRC ACCESSION NBR:9107160073 DOC.DATE: 91/07/05 NOTARIZED: NO FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana 50-316 Donald C.

Cook Nuclea'r Power Plant, Unit 2, Indiana AUTH.NAME AUTHOR AFFILIATION KWIATKOHSKI,D.

Federal Emergency Management Agency RECIP.NAME RECIPIENT AFFILIATION CONGEL,F.J.

Division of Radiation Protection

& Emergency Preparedness D

910524 ltr.

S DISTRIBUTION CODE:

IE35D COPIES RECEIVED:LTR

'NCL

+ SIZE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DOA/IRB NRR/PMAS/ILRB12 OC MEMB

~<lib 02 RGN3 FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME COLBURN,T.

NRR/DREP/PEPB9 D NUDOCS-ABSTRACT OE DIR RGN 2 COLLINSgD NSIC COPIES LTTR ENCL D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE O'ASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIK!INATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL

0"

~~V Alga

++

"%) Cy Federal Emergency Management Agency Washington, D.C. 20472 0

0 5 I9S)

Mr. Frank J. Gongel, Director Divtsicn of Radiation Protecticn Offioe of Nuclear Reactor RecpQaticn U. S. Nuclear Regulatory Gaanissicn Wa@dngton, D. C. 20555

Dear Mr. Gcngel:

This letter is in referee to the May 24, 1991, letter to Mr. Bnxa Boger, Direc~, Division of Reactor Pro5ects, Nuclear Regulatory Ca)mission (NRC) fran Mr. E. E. Fitzpatrick, Vice President, Indiana Michigan Power Ganparry, requesting a change in the enargency plan exert~ sc4xhile far the Dcnald C.

Cock Nuclear~ Plant, located in Bridgman, Michigan.

Gopies of the referenced letter and a letter frcm the State of Michigan also requesting a change in the Donald C. Cock ex)~~se schedule, have been provided to and discussed with Mr. Lawrence Cohen of your staff.

Copies of the two docu))ants are also enclosed for your informaticn.

In sunmary, several discussicns were held during 1990 ancng representatives of the State of Michigan, the American Electric Fewer,Ganpany, (the Service Corporation for the Irdiana Michigan Power Ganparry),

NRC Region III, and the Federal Dmcgency Managenant Agency (FAR) Region V ccacernir)g ~edulir)g the Donald C. Cock Nuclear~ Plant.

'Ihe current ~ule requires Michigan to participate in cne offsite REP exercise, Donald C. Cook, cae year and in three offsite REP exercises, Palisades, Fermi II, and Big Hock Point, the following yea=.

This cae ard three schedule, which has been sustained over the past several years has resulted in an unbalanced exercise schedule and workload for the State of Michigan and has added to the ~ance in the FEME Regicn V biennial REP exercise evaluation schedule, which involves 18 nuclear pea~ plant sites.

As a ~t of the ccnsensus rea):9mB by the above nanticned parties during the several discussicns in 1990, the May 24, 1991, request for an ex~en to the requirenants of 10 CFR 50, Apperdix E, Secticn IV, F.3, that an exercise be cor)d)mted at Donald C. Gook in 1992, was suhnitted to the NRC by the Indiana Michigan~ Ganpany.

This request will also me~ an exemption to the requirer)ants of Tit1e 44 CFR, Part 350.9(c).

FERA conmrs with the request frcm the State of Michigan and the Irdiana'ichigan Power Ganpany that an exemption be granted which would allow the Dcnald C. Cook offsite,'iennial exercise, currently scheduled in November 1992, to be rescheduled in May 1993.

We believe the request is )ustified

~ on the fact that such a schedule change would result in no adver~

public health and safety implicaticas and that the Donald C. Cock Nuclear Power Plant has carducted nunarous successful exercises including the last cne

'),000=:15

)

"- 91()70'5 PDR ADQCK f-)5Q

cxachx~ in-1990, which did not identify any ma)or issues requiring carrective acticns.

-Such a schedule change would allow a nnre balanced exercise schedule far the State of Michigan and exercise evaluation schedule far PEMA.

In additicn, the affected local jurisdictim, Berrien County, participates in both the Donald C. Cock and Palisades exmaises and such a Subsequent to 1992, the M~se schedule willcxatinue to neet the 10 CFR 50, Appendix E, ~cn IV, F.3, requir~ts.

Acrurclingly,~ grants an mampticn to the requinmmts of Tit1e 44 CFR, Part 350.9(c) far the Donald C. Gook Nuclear Power Plant to allow the November Your early attention to this request would be appreciated.

'Ihe overall REP exercise schedule for the next cycle of exercises in FEM. Region V will be developed during the annual scheduling conference to be held in August ar September 1991.

A ~sion on the exemptica for Donald C. Gook by that time will facilitate the develcpnent of the overall schedule.

Should you have any questicns regarding the requested m~pticn, please (202) 646-3026.

S Dennis H. Kwiatkowski Assistant Associate Direc~

Office of Technological Hazanh>>