ML17328B006

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Feb 1991 for DC Cook Unit 2
ML17328B006
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/28/1991
From: Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17328B004 List:
References
NUDOCS 9104160363
Download: ML17328B006 (1)


Text

N.R.C OPERATING DATA REPORT DOCKET NO.

50-316 DATE 14-Mar-91 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period FEB.91
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1100 6.

Maximum Dependable Capacity (GROSS MWe) 1100 notes 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.'MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit: Forced Outage Rate 24.

Shutdowns Scheduled over Next Six This Mo.

Yr. to Date Cumm.

672 '

1416 '

115368 '

672.0'416.0 76550 '

0.0 0 '

0.0 672. 0 1416. 0 75001. 9 0.0 0 '

0.0 2110364 4643404 230810457 693600 1533620 75320460 668517 1481084 72540051 I

100.0 100.0 66.4 100.0 100.0 66.4 93.9 98 '

60.5 90 '

95 ~ 1 58 '

0.0

0. 0 13.4 Months (Type, Date,and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 9i04i60363 9i0403 PDR ADOCK 050003i6

'R PDR