ML17328A488
| ML17328A488 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/03/1990 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17328A489 | List: |
| References | |
| NUDOCS 9010170131 | |
| Download: ML17328A488 (2) | |
See also: IR 05000315/1990021
Text
Docket No. 50-315
Docket No. 50-316
Qo
Company
ATTN:
Mr. Milt'on P. Alexich
Vice President
Nuclear Operations Division
1 Riverside
Plaza
Columbus,
OH
43216
Gentlemen:
This refers to the routine safety inspection
conducted
by J.
A. Isom,
B.
L. Jorgensen,
D.
G.
Passehl
and
R.
L. Bywater of this office on July
18
through August 28,
1990, of activities at the Donald C.
Cook Nuclear Plant,
Units
1 and 2, authorized
by
NRC Operating
Licenses
No.
DPR-58 and
DPR-74 and
to the discussion
of our findings with A. A. Blind, and others of your staff
at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
No violations of NRC requirements
were identified during the course of this
inspection.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter,
and the enclosed
inspection report will be placed in the
NRC
Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
p9O'O'~<>>>>
9O10Oa
ADOCN 050003
PNU
Enclosure:
Inspection
Reports
No. 50-315/90021(DRP);
No. 50-316/90021(DRP)
B. Clayton, Chief
Reactor Projects
Br anch
2
RII
By
e /jaw
RIIItt
q)y
RIII
B rgjss A, <4 Clayton
pj's<(ta
See Attached Distrubution
PhW l,~cr.
Pedyrson
p~r (>
R
I
unk
~ &tI~~