Advises That Listed Actions Will Be Performed to Return Facility to Svc.All Unit 1 safety-related & Tech Spec Equipment Job Orders,Performed During 1989 Refueling Outage, Will Be Reviewed to Confirm post-work Testing Completed
ML17328A064
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/06/1989
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis A
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8907130209
Download: ML17328A064 (5)


Text

A,CCHZRA.TED DISIR18 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8907130209 DOC.DATE: 89/07/06 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.'oqk Nuc'lear Power Plant, Unit 1, Indiana 05000315

'UTH.NAME AUTHOR AFFILIATION SMITH,W.G.

'.' Ind'iana Michig'an Power Co.

(formerly.,Z'ndiana tGt Michigan Ele RECIP.NAME RECIPIEN'2 AFFILIATION

,",(

- ~'-

i DAVIS,A.B.

',Z Document,Coqtrto3.

Branch (Document Control Desk)

SUEUECT: Advises that listed actions will be performed to return facility to svc.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR

(

ENCL

(

SIZE:

TITLE:.OR Submittal:

General Distribution R

I ft NOTES:<"

~

i'ECIPIENT ID CODE/NAME PD3-1 LA STANG,Z INTERNAL: NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 REG FILE 01 EXTERNAL LPDR NSIC COPIES LTTR ENCL 1

1 5

5 1

1 1

1 1

1 1

1 1

0 1

1 t

1 1

1

~

t 4

RECIPIENT ID CODE/NAME PD3-1 PD NRR/DEST/CEB 8H NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT,,

OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1..

1 1,

0 1l 1

4 t

h D

NOZE KO ALL 'KIDS" RZCZPXEÃIS:

PIZASE HELP US TO REDUCE KRXB!

CMIRCZ SHE tXXXMEPZ COPZROL DESK RXM P1-37 t(EZZ. 20079)

TO ZZZMZHAXB%SR NAME PKH DIPIRIHOXXQN LISTS KQt DOCUMENXS lOU DGH'T SEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20 w~ip//

II I

'"'Z. k

'I

Indiana Michigan~

Power Company ~

Cook Nuclear Plant P.O. Box 458 Bridgman, Ml 49106 616 465 5901 July 6, 1989 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 Attn:

A. B. Davis

Dear Mr. Davis:

Confirming my conversation with members of your staff this date, we will perform the following actions with regard to return to service of D.

C.

Cook Unit One:

1)

All Unit 1 Safety-Related and Technical Specification equipment Job Orders, performed during the 1989 refueling outage, will be reviewed to confirm that:

a),.

documentationexists that the required post-work "testing (or, other, required performance measure verification) has been satisfactorily completed, or, b) if required post-work testing (or other, required performance measure verification) is not complete at this time, the testing or performance measure veri-fication is scheduled and identified as an applicable Mode change constraint in the return-to-service

sequence, or c)

ASME Section XI VT-2 Examinations, which are not required to be complete prior to power operations, are identified and scheduled for performance.

The above reviews will be completed prior to changing from the current Mode 5 to Mode 4 on D.

C.

Cook Unit One.

2)

NRC RIII will be notified of the completion of the above reviews, including identification of any additional instances found where the required post-work testing (or other, required performance measure verification) was not properly completed, prior to changing from the current Mode 5 to Mode 4 on D.

C.

Cook Unit One.

3)

We will, within thirty (30) days, provide you with a full, written report, on this.rnatter.

1t is our understanding that this report may be in the form of a License Event Report (LER).

W G

Smith J

I PDR ADOCK 0/00 S907130209 890706 P

PDC h~l

U.S. Nuclear Regulatory Commisson Document Control Desk Wash.,

D.C.

20555 Page 2

C D. H. Williams, Jr.

M. P. Alexich P.

A. Barrett J.

E. Borggren R. F. Kroeger NRC Resident Inspector J. Giitter, NRC R.

C. Callen G. Charnoff, Esq.

Dottie Sherman, ANI Library D. Hahn PNSRC/B.

A. Svensson S. J. Brewer/B.

P.

Lauzau

0 r

fag

!