ML17328A064
| ML17328A064 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/06/1989 |
| From: | Will Smith INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Davis A NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8907130209 | |
| Download: ML17328A064 (5) | |
Text
A,CCHZRA.TED DISIR18 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8907130209 DOC.DATE: 89/07/06 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.'oqk Nuc'lear Power Plant, Unit 1, Indiana 05000315
'UTH.NAME AUTHOR AFFILIATION SMITH,W.G.
'.' Ind'iana Michig'an Power Co.
(formerly.,Z'ndiana tGt Michigan Ele RECIP.NAME RECIPIEN'2 AFFILIATION
,",(
- ~'-
i DAVIS,A.B.
',Z Document,Coqtrto3.
Branch (Document Control Desk)
SUEUECT: Advises that listed actions will be performed to return facility to svc.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR
(
ENCL
(
SIZE:
TITLE:.OR Submittal:
General Distribution R
I ft NOTES:<"
~
i'ECIPIENT ID CODE/NAME PD3-1 LA STANG,Z INTERNAL: NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 REG FILE 01 EXTERNAL LPDR NSIC COPIES LTTR ENCL 1
1 5
5 1
1 1
1 1
1 1
1 1
0 1
1 t
1 1
1
~
t 4
RECIPIENT ID CODE/NAME PD3-1 PD NRR/DEST/CEB 8H NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT,,
OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1..
1 1,
0 1l 1
4 t
h D
NOZE KO ALL 'KIDS" RZCZPXEÃIS:
PIZASE HELP US TO REDUCE KRXB!
CMIRCZ SHE tXXXMEPZ COPZROL DESK RXM P1-37 t(EZZ. 20079)
TO ZZZMZHAXB%SR NAME PKH DIPIRIHOXXQN LISTS KQt DOCUMENXS lOU DGH'T SEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 20 w~ip//
II I
'"'Z. k
'I
Indiana Michigan~
Power Company ~
Cook Nuclear Plant P.O. Box 458 Bridgman, Ml 49106 616 465 5901 July 6, 1989 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555 Attn:
A. B. Davis
Dear Mr. Davis:
Confirming my conversation with members of your staff this date, we will perform the following actions with regard to return to service of D.
C.
Cook Unit One:
1)
All Unit 1 Safety-Related and Technical Specification equipment Job Orders, performed during the 1989 refueling outage, will be reviewed to confirm that:
a),.
documentationexists that the required post-work "testing (or, other, required performance measure verification) has been satisfactorily completed, or, b) if required post-work testing (or other, required performance measure verification) is not complete at this time, the testing or performance measure veri-fication is scheduled and identified as an applicable Mode change constraint in the return-to-service
- sequence, or c)
ASME Section XI VT-2 Examinations, which are not required to be complete prior to power operations, are identified and scheduled for performance.
The above reviews will be completed prior to changing from the current Mode 5 to Mode 4 on D.
C.
Cook Unit One.
2)
NRC RIII will be notified of the completion of the above reviews, including identification of any additional instances found where the required post-work testing (or other, required performance measure verification) was not properly completed, prior to changing from the current Mode 5 to Mode 4 on D.
C.
Cook Unit One.
3)
We will, within thirty (30) days, provide you with a full, written report, on this.rnatter.
1t is our understanding that this report may be in the form of a License Event Report (LER).
W G
Smith J
I PDR ADOCK 0/00 S907130209 890706 P
PDC h~l
U.S. Nuclear Regulatory Commisson Document Control Desk Wash.,
D.C.
20555 Page 2
C D. H. Williams, Jr.
M. P. Alexich P.
A. Barrett J.
E. Borggren R. F. Kroeger NRC Resident Inspector J. Giitter, NRC R.
C. Callen G. Charnoff, Esq.
Dottie Sherman, ANI Library D. Hahn PNSRC/B.
A. Svensson S. J. Brewer/B.
P.
Lauzau
0 r
fag
!