Forwards Safety Insp Repts 50-315/89-09 & 50-316/89-09 on 890208-0321 & Notice of Violation
ML17326B584
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/07/1989
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17326B585 List:
References
NUDOCS 8904200324
Download: ML17326B584 (3)


See also: IR 05000315/1989009

Text

A.C CELE PATED

DlSYKBU73 ON

DEg O.'jS~gg Oq

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8904200324

DOC.DATE: 89/04/07

NOTARIZED: NO

FACIL:50-315 Donald

C.

Cook Nuclear

Power Plant, Unit 1, Indiana

&

50-316 Donald

C.

Cook Nuclear Power Plant, Unit 2, Indiana

&

AUTH.NAME

AUTHOR AFFILIATION

AXELSON,W.L.

Region 3, Ofc of the Director

RECIP.NAME,

RECIPIENT AFFILIATION

ALEXICH,M.P,.

American Electric Power Service Corp.

DOCKET

05000315

05000316

R

+35

r

1'

D

NOTES:

RECIPIENT

ID CODE/NAME

PD3-1

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

STANG,J

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

INTERNAL: AEOD

DEDRO

NRR/DEST DIR

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

t

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS1

RGN3

FILE

01

AEOD/DEIIB

NRR SHANKMAN,S

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE IEBE, J

EG PILE

02

SUBJECT:

Forwards Safety Insp Repts

50-315/89-09

& 50-316/89-09

on

890208-0321

& notice of violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

l ENCL Q

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vi&o ation Response

EXTERNAL: LPDR

NSIC

1

1

1

1

NRC PDR

R

I

S

NOTE 'IO ALL "RIDS" RECIPZZmS

~

PLEASE HELP US K) REDUCE WASTE!

CGNI'ACZ 'lHE DOCUMEMF CXNIROL DESK,

ROOYi Pl-37

(EXP. 20079) K) ELIMINATEKSR RQK FRY DIPHGEDTIGN

LISTS FOR DOCUMENI'S YOU DON'T NEZDI

D

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

23

0

Docket No. 50-315

No. 50-316

APR

0 7 1S89

American Electric Power Service

Corporation

Indiana Michigan Power

Company

ATTN: Mr. M.P. Alexich

Vice President

- Nuclear

Operations

Division

1 Riverside Plaza

Columbus,

OH

43216

Gentlemen:

This refers to the routine safety inspection

conducted

by B. L. Jorgensen,

M. J. Farber,

and

D.

G. Passehl

of this office, and by D. B. Waters,

a

consultant

to this office, on February

8 through March 21,

1989, of activities

at the Donald

C.

Cook Nuclear Plant, Units

1 and

2 authorized

by

NRC Operating

Licenses

No.

DPR-58 and

DPR-74 and to the discussion

of our findings with

W.

G. Smith, Jr.,

and others of your staff at the conclusion of the inspection.

This inspection

concluded

an extended effort with regard to the Unit 2 Steam

Generator

Repair Project.

Our inspections

examined:

construction activities

such

as concrete

placement,

welding,

and nondestructive

examination; training;

radiation protection; modifications;

and restart testing.

Previous periodic

reports

have

documented earlier findings.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

During this inspection, certain of your activities appeared

to be in violation

of NRC requirements,

as specified in the enclosed

Notice.

A written response

is required.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter,

and the enclosed

inspection report will be placed in the

NRC

Public Document

Room.

The responses'directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

PP04g00~2

o 00031~i

py0407

PDF<

4 0 K

PDC

9

American Electric Power Service

Corporation

APR

0 7 1989

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

C -"=.,":..L ..-,

Enclosures:

1. Notice of Violation

2. Inspection

Reports

No. 50-315/89009(DRP);

No. 50-316/89009(DRP)

cc w/enclosures:

W.

G. Smith, Jr.,

Plant Manager

DCD/DCB (RIDS)

Licensing

Fee

Management

Branch

Resident

Inspector,

RIII

Ronald Callen,

Michigan

Public Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Michigan Department of

Public Health

A. Bournia,

LPM,

NRR

W.

L. Axelson, Chief

Reactor Projects

Branch

2

RII

u gpss/cg

) s($ 3

RIII

e

n

1

/s t7