ML17326B100

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken in Response to Confirmatory Action Ltr
ML17326B100
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/02/1984
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17326B101 List:
References
CAL, NUDOCS 8402060369
Download: ML17326B100 (2)


Text

FEH O2 1984 Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company'TTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza

Columbus, OH 43216 Gentlemen:

Thank you for your letter dated January 20, 1984, informing us of the steps you have taken in response to our Confirmatory Action Letter dated November 17, 1983.

We will examine these matters during our ongoing review of your Regulatory Improvement Program (RPIP) and during subsequent inspections.

Your cooperation with us is appreciated.

Sincerely, Origlna1 stgned by James G. Keppler James G. Keppler Regional Administrator cc:

W.

G. Smith, Jr., Plant Manager cc w/ltr dtd Ol/20/84:

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission EIS Coordinator, VSEPA Region 5 Office RII RII unter/ld B

d 01/31/84 g/j//pl/

8402060369 840202 PDR

  • DOCK 05000315 6

PDR RIII Streeter

>/'(

RZPx Spessard A

RIII RI P

RIII UsQ5 Schultz a is Kq plep

'50

~ Q 4

kg W