MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4701996-02-0808 February 1996 In-Service Pump Test Plan, Units 1 & 2 ML17334B5661995-11-30030 November 1995 Vols I & II of Third 10-Yr Interval Long-Term Inservice Exam Plan for Class,1,2 & 3 Sys & Components for DC Cook Nuclear Plant,Unit 1, Final Plan ML17334B5671995-11-30030 November 1995 Vols I & II of Third 10-Yr Interval Long-Term Inservice Exam Plan for Class 1,2 & 3 Sys & Components for DC Cook Nuclear Plant,Unit 2, Final Plan ML17332A2521994-08-0303 August 1994 Rev 3 to Plant Manager Procedure (PMP) 12 PMP 3150 PCP.100, Radwaste Pcp. ML17332A2491994-08-0303 August 1994 Rev 7 to Plant Manager Procedure (PMP) 12 PMP 6010 OSD.001, Odcm. ML20063K0631994-02-11011 February 1994 Change Sheet 1 to Rev 5 to Plant Manager Procedure (PMP) 12 PMP 6010 RPP.304, Use of HEPA Vacuum Cleaners. W/ Updated Index,Page 14 ML17331B0441993-11-0909 November 1993 Rev 15 to Emergency Response Manual. W/931109 Ltr ML17334B4851993-08-0909 August 1993 Rev 14 to Emergency Response Manual. W/930809 Ltr ML17334B4821993-04-0202 April 1993 Rev 3 of Pump Inservice Test Program. ML17329A5431992-06-11011 June 1992 Change Sheet 7 to Rev 6 to Procedure PMP 2080 EPP.107, Notification of Plant Personnel. ML20077S7281991-03-14014 March 1991 Rev 3 to PMP 6010.OSD.001, Odcm ML17325B3791990-03-0101 March 1990 Change Sheet 1 to Rev 3 to Procedure PMP 2080 EPP.106, Initial Offsite Notification. ML17334B3551990-02-0505 February 1990 Rev 2 to DC Cook Nuclear Plant Units 1 & 2 Inservice Testing Pump Program. ML17334B3561990-02-0505 February 1990 Rev 3 to DC Cook Nuclear Plant Unit 2 Inservice Testing Valve Program. ML17334B3571990-02-0505 February 1990 Rev 3 to DC Cook Nuclear Plant Unit 1 Inservice Testing Valve Program. ML20246M2191989-03-21021 March 1989 Procedure MS-3.2.1.9-1B, Maint & Surveillance Ite Medium Voltage Switchgear Equipment ML17325B0511988-12-0909 December 1988 Interim Acceptance Criteria for Safety-Related Piping Sys. ML17334B1491987-10-0505 October 1987 Rev 2 to DC Cook Nuclear Plant Unit 1 Inservice Testing Valve Program. ML17334B1501987-10-0505 October 1987 Rev 2 to DC Cook Nuclear Plant Unit 2 Inservice Testing Valve Program. ML20212A3191986-10-0202 October 1986 Rev 1 to Procedure 12 PMP 4021 TRP.001, Reactor Trip Review ML17324A9301986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.001, Maint Procedure for Repowering RHR Pump. ML17324A9321986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.003, Maint Procedure for Repowering Pressurizer Backup Heaters. ML17324A9331986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.005, Maint Procedure for Repowering Containment Valves. ML17324A9341986-05-29029 May 1986 Rev 0 to Procedure 1 Thp 6030 IMP.304, Pressurizer PORV Cable Repair. ML17324A9351986-05-29029 May 1986 Rev 0 to Procedure 1 Thp 6030 IMP.305, App R Post-Fire Repowering of In-Containment Valves. ML17334A9711986-05-22022 May 1986 Rev 0 to Procedure 12-OHP 4023.100.001, Unit 1 Emergency Remote Shutdown. ML20213F6011986-05-15015 May 1986 Rev 1 to Procedure PMP 6010.OSD.001, Offsite Dose Calculation Manual ML17324A9001986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part Iv,Training for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML17324A8991986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part Ii,Writers Guide for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML17324A8971986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part I,Specific Technical Guidelines for Donald C Cook Nuclear Plant. ML18005A0161986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part III, Verification/Validation for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML20195C5361986-03-15015 March 1986 Public Version of Emergency Response Manual for DC Cook Nuclear Plant ML20141D7121986-02-28028 February 1986 Rev 0 to Master Insp Plan ML20137J6061985-12-17017 December 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 2 to Erp 2.07, Outside Agency Liaison, Rev 1 to Erp 2.08, Initial Assessment Group Runner & Rev 2 to Erp 5.01.W/860117 Release Memo ML17334A9441985-11-0505 November 1985 Change Sheet 1 of Rev 9 to Spec DCCFP101QCN, Matl & Application Spec - Initial & Repair Installations, Revising App D Silicon Foam Scope of Work to Identify New Fire Barriers & for Cross Referencing Fire Zones ML17334A9191985-10-15015 October 1985 Implementation Plan of Reg Guide 1.97,Rev 3 for Donald C Cook Nuclear Plant Units 1 & 2, Status Rept 1999-05-07
[Table view] |
Text
PMP EPP INDEX INDIANA 8t MICHIGAN POWER COMPANY DOiVALO C. COOK iVUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Number Ti tl e'evision And Oat No.)
C "mments PMP 2080 EPP.013 Duties of the Individual Who Rev, 1 Discovers an Emergency 6-24-82 Condition EPP.014 Personnel Injury Revision 1 6-15-82 EPP.015 Responsibility of the On-Site Revision ] TP-1,5-27-82 Exp NA Emergency. Coordinator 4-29-82 EPP Appendix A Telephone Numbers for Key Revision Plant Personnel 9-23-82 EPP Appendix B Hospital Assistance Plan Revision 2 3-31-81 EPP Appendix C Radiological Supplement Revision 0 4-1-81 Pa<a 1A 82 i'Oi 5061'6 '.820930 Rev oat~
'ADOCK '05000315 'DR F 'PDR
V t
EPP APPENDIX A LIST OF EFFECTIVE PAGES PAGE NUMBER REVISION NUMBER AND DATE Page 1 of 14 Revision 3, 9-23-82 Page 2 of-'14 Revision 3, 9-23-82 Page 3 of 14 Revis'ion 3, 9-23-82 Page 4 of 14 Revision 3, 9-23-82 Page 5 of 14 Revision 3, 9-23-82 Page 6 of 14 Revision 3, 9-23-82 Page 7 of 14 Revision 3, 9-23-82 Page 8 of 14 Revision 3, 9-23-82 Page 9 of 14 Revision 3, 9-23-82 Page 10 of 14 Revision 3, 9-23-82 Page 11 of 14 Revision 3, 9-23-82 Page 12 of 14 Revision 3, 9-23-82 Page 13 of 14 Revision 3, 9-23-82 Page 14 of 14 Revision 3, 9-23-82 Page 1 of 1 Rev. 3, 9-23-82
~ ~
EPP APPENDIX A, TELEPHONE NUMBERS FOR KEY PLANT PERSONNEL MANAGERIAL HOME OFFICE W.G. Smith, Jr.
B.A. Svensson E.L. Townley R. D. Begor OPERATIONS K. R. Baker H.M. Chadwell D.R. Campbell C.E. Murphy D.M. Draper D.F. Krause T.R. Stephens G.F. Northcutt L.K. Smith A.S. Guzicki L.G. Boone H.F. Runser TECHNICAL E.A. Smarrella V.C. Vandenburg A.A. Blind D.E. Duncan T.A. Kriesel D.C. Palmer R. Simms J.T. Wojcik C.A. Ross MAINTENANCE R.L. Dudding F.W. Wenman W.D. Cornell OUTAGE PLANNING E.A. Abshagen Page 1 of 14 Revision 3, 9-23-82
~ ~
EPP APPENDXX A TELEPHONE NUMBERS FOR KEY PLANT PERSONNEL QA HOME OFFICE J.F. Stietzel E.A. Morse H.H. Bolinger T.P. Bielman R.L. Otte ADMINXSTRATXVE L.J. Matthias D.A. Yount M.E. McAllister D.D. Ne'lson F.A. Arsenault Page 2 of 14 Revision 3, 9-23-82
< I vI i ~ i . 0 II - -C ~ I pi ~ - II ~ ~ 4.
. 'PP APPENDIX A PLACE OPERATIONS STAGING AREA DIAGRAM HERE Page 3 of 14 Revision 3, 9-23-82
~ S ~~"<<wa<<I ~ A <<' I>>' ~ 'It<< IW ' ~ I ~
' ' ~
'PEMTCONS STAGING AREA RA OIAOO/V v///oLE. d0av ROTcN/orv cou/v7ER
'NMCR
'/REC7CC.
'dllORA6C. AREA wooer doov cau//r ROO~
P4.
O 0 CI
/IA//
0'i-IOlI/ 05 IV A /ICA//A6CR 0
'V
'PERA gtjt6//V6 7/O/VS AREA I iVORE// OASE/VlEhf7 CCALSROOI<<l dOUTP dACEIKE/7 CCAC <<Maa/II
<C f/V CT/V S
OPERAIT/O//4 Ogi~~z
EPP APPENDIX A PLACE TECHNICAL SUPPORT CENTER DIAGRAM HERE Page 4 of 14 Revision 3, 9-23-82
TECHNICAL SUPPORT CENTER
/
t3//fAD5c7 JACK5 (4 /flTRA)
JPIC
/ /3pI/axle wr a IIVPO '4 5Uppcv cAOI/vgt5 / W4 vI 0 UPf T t4 4 ~ it
/Ac.l) PB /f'OP
%J Q O/R Zp(/" O TO fOP QAEP5C O RADIO Q k
Lo i/fAC5f7 0o HRC ZCC/C'(4)
Piieef 5/D S AfP5C RCO
~
0 INATEJC .-fA~
PCAH T f'VWCUATIOnr
-I-i~5PO g HfATER (QH'fAD5cTJAG RAOIO5 PA oi~ Tfl,fCOPI 7O I fo< I I I I I
/4$ I flTRA C3 I I I P55D I ~
I I I
e.J f4/RA H/5rour aoARD 8-clTgA 574TU5 HI5 /ORY aOARD aoARD j ECHIV/CA/. 5/IPPORT I c/V TcR HfAO55 l SAC/I'5 I'4)
EPP APPENDIX A PLACE TRAINING BUILDING-EMERGENCY OPERATIONS FACILITY DIAGRAM HERE Page 5 of 14 Revision 3, 9-23-82
TRAINING BVILOING EMERGENCY OPERATIONS FACILITY RA 0IATIOtl tTDITROL, rhhD WASTE NAVOLINO MANAOCIt VAUI T CLASSROOM X IO83 RttOVtRY AND CONTROL KANAOtR CtASSROOH ~ I CLASSROOM ~Z CtASSRA1M +7 VINCE ROOIIT CON tERENPE EMERCiQlQ'IESICN ANO COMMUNICATIONS CONSTRUCTCH HANAOEIt t COTE ASSN'T ta S. SEND SPARE &%RE SPARE XEROX AND
'+
CtASSROOIrI CLASSROOM OMlrIANO CCN'TER
~ RECORD J~ NRC I~ '
Q)l
~ I ~r (Zl S OCPID 0)CAIIIINr orNRC 5PAcc TCCNN I CA L SCIIttNILINCi AIID SUPPORT PLANNIHO IWWAOCR NAKAOCtt
~ CN C CO TRAININQ OUILDINQ OC. COOK trretOCNCT OPCAATIONS PPCIII OIIIKIMIl,rr NAY It Hit OAtttu. Srrrrt'lC
0 0 EPP APPENDIX A PLACE TRAINING BUILDING-EMERGENCY OPERATIONS FACILITY 2 DIAGRAM HERE Page 6 of 14 Revision 3, 9-23-82
a l
~ Ci m 4 ~~
TRAINING BUILOING EblERGENCY OPEfQTIONS FACILITY 2 CNRCNQLCGCAL STORY CANTCiV I NPO AEP 80ARO DOSE ASSM'T EPE TEST TELEPNONE MAP COMMUNICATION JACK 8G55lUSP T ELECTR CLASSROOM 2 TSC/EOF DOSE ASScSQENT hag CCMI4gdCATIONS TRAINING 8UII DING MERGENCT OPERATIONS FACILITY CLC. COOK NUCI.EAR 9RIOGMAN.MI lj IT 4X 1
EPP APPENDIX A PLACE TRAINING BUILDING-EMERGENCY OPERATIONS FACILITY 3 DIAGRAM HERE Page 7 of 14 Revision 3., 9-23-82
TRAINING BUILQING EMERGENCY OPERATIONS FACILITY 3
@PE MAP5 a
IL nsv vameuc
~>chYNN 'wORK OCQ46U)QIOW HLSTORY WARQ
)IS II0 CLASSROOM ~4 CASlgOM <5 C7MHANO CPI R l~ ~ IN lw 5UIIJ)IH OC COOK CWRlgllKY0%ÃATKN R4CLP TY wwY I+ i%5 OARktLI STINCR 3
sa<ocweeg
OFF-SITE NOTIFICATION LIST (PMP-2080-EPP-012)
HOME OFFICE Warnock (Radiological Support Section Manager)
M.P. Alexich (Assistant Vice-President and Chief Engineer)
H. Soebel (Assistant Division Nuclear Engineer) Emerg.
R.W. Jurgensen (Consulting Nuclear Engineer) Emerg.-
S.J. Milioti (Assistant Chief Nuclear Engineer)
R.S. Hunter (Executive Vice-President Construction and N.Y. Emerg.-
Engineering)
G.E. LeMasters (Executive Assistant to the I&M President)
W.A. Black (I&ME Co. President)
R.C. Menge (I&ME Co. Vice-President)
J.E. Hills (Energy Information Center Manager)
C.W. Hasty (Public Affairs Director)
V.P. LaBarbera (Information Services Manager)
E.R. Swanson (NRC Resident Inspector)
N. DuBry (Assistant NRC Resident Inspector)
Michigan State Police Benton Harbor Post Page 8 of 14 Revision 3, 9-23-82
~ ~
EPP APPENDIX A OFF-SITE NOTIFICATION LIST (Cont'd)
(PMP-2080-EPP-012)
HOME OFFICE Michigan State Police Emergency Planning Berrien County Sheriff's Department Page 9 of 14 Revision 3, 9-23-82
EPP APPENDIX A TELEPHONE NUMBERS FOR OFF-SITE GROUPS NAME OF OFF-SITE GROUP OR AGENCY: TELEPHONE Berrien County Sheriff's Department
.Emerg..
The Michigan Department of State Police (Benton Harbor Post 57)
The American Electric Power Support Organization (AEPSO) or Microwave Regional Director, UNSRC, Region III, Office of Inspection and Enforcement The Michigan Department of Public Health Memorial Hospital, St. Joseph, Michigan General Emerg.
Mercy Hospital, Benton Harbor, Michigan American Nuclear Insurers Department of Energy (Argonne National Labs)
Duty Hours:
Off-Duty Hours:
United States Coast Guard City of Bridgman Fire Department Lake Township Fire Department Lake Township Ambulance National Oceanic and Atmospheric Administration ~ 4 Fort Wayne Dispatcher or Microwave or or, Westinghouse (See page 12)
W18".;"
INPO Page 10 of 14 Revision 3, 9-23-82
EPP APPENDIX A EMERGENCY TELEPHONE NUMBERS FOR NRC NOTIFICATION TELEPHONE SYSTEM TELEPHONE NUMBER
- l. Emergency Nofitication Ssytem to NRC (Lift Receiver from Cradle)
Operations Center
- 2. Commercial Telephone System to NRC 202-951-9550 Operations Center (via Bethesda Central Office)
- 3. Commercial Telephone System to NRC 301-427-4056 Operations Center (via Silver Spring Central Office)
- 4. Health Physics Network to NRC *22 (Touch-Tone)
Operations Center 22 (Rotary Dial)
- 5. Commercial Telephone System to NRC 301-492-7000 Operator (via Bethesda General Office)
Page 11 of 14 Revision 3, 9-23-82
4 EPP APPENDIX A WESTINGHOUSE EASTERN SERVICE AREA EMERGENCY COMMUNICATION NETWORK Please inorm one Westinghouse contact, using this list in the order shown, to ensure early notification to Westinghouse of an emergency occurring at your plant. Please be prepared to discuss as many facts as are available at the time of the call and identify a cognizant individual in your organization to provide continuing communications and updates to Westinghouse.
Title Name Office Home HHL
- 1. Operating Plant Service J.D. Campbell Manager 2nd Alternate Ron Von Osinski
- 2. Service Response Manager Jo Leblang 1st Alternate John Miller 2nd Alternate J.D. Campbell Emergency Response Frank Bakos Director
- 4. Emergency Response Ron Lehr Deputy Director
- 5. Emergency News Mike Mangan Communications NOTE: Unless indicated otherwise, all phone numbers are area code Where an area code other than:
office, home, and HHL numbers.
~is shown, it applies to the Page 12 of 14 Revision 3, 9-23-82
EPP APPENDIX A CANTON CENTRAL COMPUTER COMPLEX TSO Dial Up Console Room-Console Operator Shift Supervisor Communications Room Alternate:
OFFICE HOME Joe Hubbard i Head, Computer Operations Tom Marney Asst. Head, Computer Operations Dick Bezek Head, Computer Systems Division Todd Dixon Deputy Director, ISD Charles Falcone Director, ISD Page 13 of 14 Revision 3, 9-23-82
0 EPP APPENDIX A MIDAS COMPUTER PROGRAM TSO Dial Up OFFICE Data General Tom Celi Mike Pine Off-Hours Status Telecopy:.
Pickard, Lowe & Garrick Mark Abrams Page 14 of 14 Revision 3, 9-23-82
"') -" '5 Wh ~ hV C
P, 4
t P