ML17326B016
| ML17326B016 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/18/1985 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17326B017 | List: |
| References | |
| NUDOCS 8510230160 | |
| Download: ML17326B016 (4) | |
See also: IR 05000315/1985025
Text
OCT 18 1985
Docket No. 50-315
Docket No. 50-316 /f5 L5
American Electric Power Service
Corporation
and Michigan Electric Company
ATTN:
Mr. John
E. Dolan
Vice Chairman
Engineering
and Construction
1 Riverside Plaza
Columbus,
OH
43216
Gentlemen:
This refers to the routine safety inspection
conducted
by Mr. S.
M. Hare of this
office on August
14 through September
5, 1985, of activities at Donald C.
Cook
Nuclear Plant, Units
1 and 2, authorized
by NRC Operating Licenses
No.
and No. DPR-74 and to the discussion
of our findings with Mr. W. G. Smith at the
conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted of a selective
examination of procedures
and representative
records,
observations,
and
interviews- with-personnel.
During this inspection, certain of your activities appeared
to be in violation
of NRC requirements,
as specified in the enclosed
Ap~endix.
A written response
is required.
Additionally, Paragraph
4.d and Paragraph
7.a of the enclosed
report identify
concerns
we have relative to containment
temperature
survey requirements
and
corrective action you have taken
on excessively
leaking containment isolation
valves.
In your response
to this inspection report you are requested
to;
respond to the unresolved
item (315/85025-03(DRS))
identified in Paragraph
4.d, pertaining to containment
temperature
survey requirements
and; include
a
Kist of containment isolation valves that have
been consistently failing (30%
or greater failure rate) their local leak rate tests,
a summary of the corrective
actions
taken
and your plans to preclude excessive
containment isolation valve
leakage in the future.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter, the enclosures,
and your response
to this letter will be placed
in the NRC's Public Document
Room.
8510230160
851018
ADOCK 05000315.
PDR ~
i/I
(
I
I
I'
~
I
lit
I
ll
1
41
It
f
I.
II
~
It ~
II I
I
I
I
II
American Electric Power Servic
Corporation
OCT l 8 1985
The responses
directed
by this letter and the accompanying
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget as required
by
the Paperwork
Reduction Act of 1980,
PL 96-511.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection
Reports
No. 50-315/85025
DRS);
No. 50-316/85025
DRS)
cc w/enclosures:
W. G. Smith, Jr., Plant Manager
DCS/RSB
(RIDS)
Licensing
Fee Management
Branch
Resident
Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Nuclear Facilities
and
Environmental
Monitoring
Section
r
C. J.
Pa eriello, Director
Division of Reactor Safety
RIII
RIII
QI>>A'are/ls
Guldemond
10/15/85
>o[(e(gg
mermann
y s
RI
Pa
(el 1 o
Jo g,>
.n
I
V
I
Veil
~ I
I
I
~
~
I
I
I
l
I V
/
I
I I
I
i"
J
V
V
, /1
I
J~I