ML17326A977

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-315/85-27 on 850827 & 0903.Apparent Violations Under Review for Potential Enforcement Action
ML17326A977
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/12/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17326A978 List:
References
NUDOCS 8509160257
Download: ML17326A977 (4)


See also: IR 05000315/1985027

Text

SEP >2 586

Docket No. 50-315/V4 t

American Electric Power Service

Corporation

Indiana

and Michigan Electric Company

ATTN:

Mr. John

E. Dolan

Vice Chairman

Engineering

and Construction

1 Riverside Plaza

Columbus,

OH

43216

Gentlemen:

This refers to the special

safety inspection

conducted

by W. G. Guldemond of

this office on August

27 and September

3, 1985, of activities at the D. C.

Cook

Unit

1 Nuclear Plant authorized

by NRC Operating License

No. DPR-58 and to the

discussion of our findings with Messrs.

W.

G. Smith, Jr.

and

K. R. Baker on

August 27,

1985,

and with Mr. K. R. Baker on September

3, 1985.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

During this inspection, certain of your activities appeared

to be in apparent

violation of NRC requirements.

These

apparent violations are being reviewed

for potential

enforcement action.

You will be notified in subsequent

correspondence

as to the resolution of these findings.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the

NRC

Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Enclosure:

Inspection

Report

No. 50-315/85027(DRS)

See Attached List For Distribution

8509l60257

8509l2

PDR

ADOCK 05000315

8

PDR

C . J. Papersello,

Director

Division of Reactor Safety

g

ll',

.i

II

)I

American Electric Power Service

Corporation

SEP >2 58S

Distribution

cc w/enclosure:

W. G. Smith, Jr., Plant Manager

DCS/RSB

(RIDS)

Resident

Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Nuclear Facilities

and

Environmental

Monitoring

Section

RI I

Gul

09/ll/

/1 c

5

e e

R II

p r llo

I/

t

H3d

P

II

(

lf

e

r

".

y

e

~

v)

'~

~ y

lt

I

g