Forwards IE Insp Repts 50-315/81-21 & 50-316/81-24 on 810801-0930 & Notice of Violation
ML17326A919
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/18/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17326A920 List:
References
NUDOCS 8112010297
Download: ML17326A919 (4)


See also: IR 05000315/1981021

Text

Nov

f g ]gg]

Docket No. 50-315

Docket No. 50-316

Rssaz~

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

ggyg Q )9P$ m

.

u,s. taaM ~~ICE

COMJA'I+~

fg

b/g pr

Gentlemen:

This refers to the routine safety inspection

conducted by Messrs.

E.

R.

Swanson

and N. E. DuBry of this office on August

1 through September

30,

1981, of

activities at D.

C.

Cook Nuclear Plant, Units

1 and 2, authorized

by NRC

Operating Licenses

No. DPR-58 and No. DPR-74 and to the discussion of our

findings with Mr. Shaller

and others of your staff during the course of the

inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

During this inspection,

certain of your activities appeared

to be in non-

compliance with NRC requirements,

as specified in enclosed

Appendix A.

A written response,

submitted under oath or affirmation, is required.

Further,

we are concerned

about the continuing pattern of late and incom-

plete responses

to NRC correspondence

and about another

example of misleading

or incorrect -information being provided to the

NRC.

These

concerns

are

documented in further detail in paragraphs

2.o, 2.p and

8 of the attached

report,

and they were also discussed

during

a meeting held at your Columbus,

Ohio offices on November 2,

1981, which was attended

by me and others of

this office and you and others of your company for the purpose of discussing

your actions in response

to matters

discussed

during the Enforcement

Con-

ference held in our office on August 4,

1981.

In addition to your response

to the items of noncompliance,

please

describe

those actions

you have taken

or plan to take in regard to these matters.

This office considered

escalated

enforcement action for the matter involving

misleading or incorrect information being provided to the

NRC.

However,

due

9ii2010297 Bi 1 i18

PDR

ADOCK 05000315

~ 6

PDR

~ '7

.a

I

~ I

7'

f ft s f tl 77

~ ~

7

It

I

3 *"

tf

American Electric Power Service

Corporation

"2"

to the fact that escalated

enforcement action is pending for similar matters

which were identified prior to this inspection, this action was not taken.

Nevertheless,

we must emphasize

that similar occurrences

can not and will not

be tolerated by the

NRC.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter, the enclosures,

and your response

to this letter will be placed

in the NRC's Public Document

Room. If the enclosures

contain any information

that you or your contractors believe to be

exempt, from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone

within seven

(7) days from the date of this letter of your intention to file

a request for,withholding; and (b) submit within twenty-five (25) days from

the date of this letter

a written application to'his office to wi:thhold such

information.

Section 2.790(b)(l) requires that any such application must be

accompanied

by an affidavit executed

by the owner of the information which

identifies the document'r pa'rt sought'o

be withheld,

and which contains

a

full statement

of the reasons

which a'e the bases for the claim that the

information should be withheld from public disclosure.

This section further

requires

the statement

to address

with specificity the considerations

listed

in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incor-

porated

as fax as possible into a separate

part of the affidavit. If we do

not hear from you in this regard within the specified periods

noted above,

a

copy of this letter, the enclosures,

and your response

to this letter will be

placed in the Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Orfgtnal sfgned by

Ao Bert Davis

James

G. Keppler

Regional Administrator

Enclosures:

1.

Appendix A, Notice

of Violation

2.

Inspection Report No.

50-315/81-21

and

No. 50"316/81-24

cc w/encls:

D. V. Shaller, Plant

Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

RIII

Hayes/jp

10/22/81

RII

Sp

sard

RIg

Da is

RIII

'p ler

g ~,

n

1