UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION I I I
799 ROOSEVELT ROAD
GLEN ELLYN,ILLINOIS60137
CENTRAL FILES
April 9,
1981
Docket No. 50-315
Docket No. 50-316
American Electric Power Service
Corporation
and Michigan Power
Company
ATTN:
Mr. John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
'gg/Pp'i
+s
08 ea,
g
co~le@ r~
Gentlemen:
This refers to the routine inspection
conducted
by Messrs.
E.
R.
Swanson
and
N. E. DuBry of this office on January
1-31,
1981, of activities at
D.
C.
Cook Nuclear Plant, Units
1 and 2, authorized
by NRC Operating
Licenses
No. DPR-58
and No. DPR-74 and to the discussion of our findings
with Mr. Shaller at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted
of a selec'tive
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
During this inspection, certain of your activities appeared
to be in non-
compliance with NRC requirements,
as described in the enclosed
Appendix A
and
a written response
is required.
Item
1 of Appendix A is similar to
several previous instances
of providing questionable
responses
to the
NRC'nd
therefore special
emphasis
should be given this matter in your response
to this item.
We evalutated
your submitals to the
NRC regarding item
1
of Appendix A for material false statements
and concluded
the signifiance
of the item did not warrant escalated
enforcement action,
however,
the
matter is of concern to us
and
we will review your response
to this item
closely.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter, the enclosures,
and your response
to this letter will be placed in the NRC's Public Document
Room, except
as follows.'f the enclosures
contain information that you or
your contractors
believe to be proprietary,
you must apply in writing to
this office, within twenty-five days of the date of this letter, to withhold
e
i
!
American Electric Power Service
- 2-
Corporation
April 9,
1981
such information from public disclosure.
The application must include
a full
statement
of the reasons
for which the information is considered proprietary,
and should be prepared
so that proprietary information identified in the
application is contained in an enclosure
to the application.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
James
G. Keppler
Director, Region III
Enclosures:
l.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-315/81-01
and
No. 50-316/81-01
cc w/encls:
D. V. Shaller,
Plant
Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local
Ronald Callen, Michigan
Public Service
Commission
RII
RII
Boy /jp
Hex hman
3/11/81~ 3)q
PI L
Knop'III
Str eter
RI I
RII (
K pier
Rl~~