ML17326A887

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/81-01 & 50-316/81-01 on 810101-31 & Notice of Violation
ML17326A887
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/09/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17326A888 List:
References
NUDOCS 8105110504
Download: ML17326A887 (3)


See also: IR 05000315/1981001

Text

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION I I I

799 ROOSEVELT ROAD

GLEN ELLYN,ILLINOIS60137

CENTRAL FILES

April 9,

1981

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

'gg/Pp'i

+s

08 ea,

g

co~le@ r~

Gentlemen:

This refers to the routine inspection

conducted

by Messrs.

E.

R.

Swanson

and

N. E. DuBry of this office on January

1-31,

1981, of activities at

D.

C.

Cook Nuclear Plant, Units

1 and 2, authorized

by NRC Operating

Licenses

No. DPR-58

and No. DPR-74 and to the discussion of our findings

with Mr. Shaller at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted

of a selec'tive

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

During this inspection, certain of your activities appeared

to be in non-

compliance with NRC requirements,

as described in the enclosed

Appendix A

and

a written response

is required.

Item

1 of Appendix A is similar to

several previous instances

of providing questionable

responses

to the

NRC'nd

therefore special

emphasis

should be given this matter in your response

to this item.

We evalutated

your submitals to the

NRC regarding item

1

of Appendix A for material false statements

and concluded

the signifiance

of the item did not warrant escalated

enforcement action,

however,

the

matter is of concern to us

and

we will review your response

to this item

closely.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter, the enclosures,

and your response

to this letter will be placed in the NRC's Public Document

Room, except

as follows.'f the enclosures

contain information that you or

your contractors

believe to be proprietary,

you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhold

e

i

!

American Electric Power Service

- 2-

Corporation

April 9,

1981

such information from public disclosure.

The application must include

a full

statement

of the reasons

for which the information is considered proprietary,

and should be prepared

so that proprietary information identified in the

application is contained in an enclosure

to the application.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

James

G. Keppler

Director, Region III

Enclosures:

l.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-315/81-01

and

No. 50-316/81-01

cc w/encls:

D. V. Shaller,

Plant

Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local

PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service

Commission

RII

RII

Boy /jp

Hex hman

3/11/81~ 3)q

PI L

Knop'III

Str eter

RI I

RII (

K pier

Rl~~