ML17326A841

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 81-01, Design Problems Involving Indicating Pushbutton Switches Mfg by Honeywell,Inc. No Response Required
ML17326A841
Person / Time
Site: Cook  
Issue date: 01/23/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 8102190367
Download: ML17326A841 (4)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman

, Engineering 2 Broadway New York, NY 10004 cc w/encl:

D.

V Shaller, Plant Manager ral Files AD/Licensing AD/Operating Reactors AEOD Resident Inspector, RIII PDR Local PDR

NSIC, TIC Ronald Callen, Michigan Public Service Commission

I C'

I'

~p8 4Eqy, (4

P0

~y 0

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 799 ROOSEVELT ROAD GLEN ELLYN,ILLINOIS60137 January 23, 1981 Gentlemen:

The enclosed IE Circular'o.

81-01 contains recommendations that may be applicable to your facility with regard to design problems associated with the subject indicating pushbutton switches.

Should you have any questions regarding this circular or the recommendations contained herein, please contact this office.

Sincerely,

'g. no~'~

ames G. Keppler Director

Enclosure:

IE Circular No. 81-01

I