Ro:On 801215,spray Header Isolation Valves CTS-124E & CTS-128E Were Discovered Sealed & Locked Closed at 9:30-h. Valves Reopened Relocked & Resealed in Correct Position. Followup Rept Will Be Submitted by 801226
ML17326A804
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/16/1980
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8101050356
Download: ML17326A804 (4)


Text

REGULATORY,FORMATION DISTRIBUTION SY M (RIDS)

ACCESSION NBR:8101050356 DOC ~ DATE 80/12/16 NOTARIZED:

NO DOCKET FACIL:50 316 Donald C ~

Cook Nuclear Power Plant~ Unit 2i Indiana 8

05000316 AUTH BYNAME AUTHOR AFFILIATION SHALI ERiD>V.

Indiana L Michigan Electric Co, REC I P ~NAIVE'ECIP IKNT AF F ILI ATION KEPPLERgJ

~ G ~

Region 3i Chicagoi Office of the Director SUBJECT!

RO:on 801215 spray header isolation valves CTS 120K 8,

CTS 128E were discovered sealed 8 locked closed at 9<30 h ~

Valves reopened relocked 8 resealed in correct position ~

Followup rept will be submitted by 801226.

DISTRIBUTION CODK:

M007S COPIES RECEIVED:LTR ENCI SIZEi a

TITLE: LER (Backf i t)

NOTES:Send 3 copies of all material to ILE, 05000316 RECIPIENT ID CODE/NAME COPIES LTTR ENCL RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERNALS AKOD I&K" EG FIL EXTERNAL: LPDR 0Q 02'1 03 ASLBP/J ~ HARD MPA OP EX EVAL BR NSIC JAN Cl9at Q

TOTAL NUMBER OF COPIES REQUIRED:

LTTR ENCL

l' n

1 a

f I 'I ki ll L

4 t,

J I

rtlOPIDOll f

lwcHa

~

INDIANA8r MICHIGANEIECTRIC COMPANY DONALDC. COOK NUCLEAR PLANT P.O. Box 468, Bridgman, Michigan 49106 (616) 4654901 December 16, 1980 C7 Vl 1

t'a<,jc,

<<C C7 40 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

This is to confirm our verbal report to NRC Region III Inspector, Wi E.

Swanson, at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> on December 15, 1980.

At that time we reported that during a tour being performed by a plant Auxiliary Equipment Opera-tor, it was discovered that two spray header isolation valves (CTS-124E and CTS-128E),

located in the Unit 2 East Containment Heat Exchanger Room, were sealed and locked closed.

This condition was immediately reported to the Shift Operating Engineer who determined that the as found condition was incorrect.

Instructions were given to immediately reopen the valves and relock and reseal them in the correct position.

A written followup report will be submitted by December 26,

1980, as required by Technical Specification Section 6.9.1.8.

Sincerely, D.V. Shaller Plant Manager

/bab cc:

J.E. Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger R.W. Kilburn E.

Swanson/N.

DuBry NRC RO:III R.C. Callen MPSC G. Charnoff, Esq.

J.M. Hennigan W. Lavalle EPRI PNSRC J.F. Stietzel E.L. Townley Dir., MXPC (4 copies)

Dir., IE (40 copies) po>7 I0

~t '

P