ML17326A769

From kanterella
Jump to navigation Jump to search
Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML17326A769
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 8011070270
Download: ML17326A769 (2)


Text

Docket No. 50-$ 15 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

Enclosed is IE Supplement No.

3 to Bulletin No.79-01B.

This supplement clarifies two issues raised by Supplement No. 2.

These are (1) the sub-mittal of qualification information for equipment resulting from TMI Action Plan requirements and (2) the qualification of equipment which is required to achieve a cold shutdown condition.

This action is a result of industry feedback to NRC regarding interpretation of Supplement No. 2.

The informa-tion presented is applicable to your submittal regarding environmental qualification of Class 1E equipment which is required by November 1,

1980.

Should you have questions regarding this Supplement please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Supplement No.

3 to Bulletin No.79-01B cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPR
Director, NRR/DOR AEOD Resident Inspector, RIII PDR Local DPR NSIC TIC Ronald Callen, Michigan Public Service Commssion RIII RIII

.3VK Heis an/jp ppler 10/24/80

<~Z gq~ ~ZO

'3