ML17326A761

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML17326A761
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/02/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 8010280036
Download: ML17326A761 (1)


Text

Docket No. 50-315 Docket No. 50-316 graf g.%$

American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed IE Circular No. 80-22 is forward d t f

rwar e o you or information.

No written response is required.

Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Circular No. 80-22 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Corporation RIII RI I Hei an/np Keppler ioIzIso 80.1Oaeou3G--