ML17326A655

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-13, GE Type SBM Control Switches Defective CAM Followers. No Specific Action or Response Required
ML17326A655
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/02/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 8004150011
Download: ML17326A655 (2)


Text

'CENTRAL FlLES Docket No. 50-315 Docket No. 50-316 APR 8

$8O American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the infor-mation for possible applicability to their facilities.

No specific action or response is requested at this time; however, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions, if re-quired. If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, James G. Keppler Director

Enclosure:

IE Information Notice No. 80-13 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Piles

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission RIII Hei an/km 4/2/80 RIII Kp ler aaoazsoo(i

23JR JAB'i ~, 5 l