ML17326A564

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-07, Pump Shaft Fatigue Cracking. No Response Required
ML17326A564
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/29/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 8003120331
Download: ML17326A564 (1)


Text

Docket No. 50-315 Docket No. 50-316 FFR r,~ xw American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the inform-ation for possible applicability to their facilities.

No specific action or response is requested at this time. If further NRC evaluations so in-

dicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, James G. Keppler Director

Enclosure:

IE Informa Notice No. 80-07 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission RIII Heishman/pd 2/29/80 RIII K pier 8008>80 uZ I